Laserfiche WebLink
• <br />• <br />Installed first course of block. (staff) <br />Installed remainder of block. (girl scouts) <br />Added soil to bed. (staff) <br />Planted native grasses and wildflowers. (girl scouts) <br />Installed cap block. (staff) <br />Remaining work on this project includes, installing sign, mulching bed and backfilling <br />around bed. <br />• Applied fertilizer to approximately 40 acres of turf (parks and school sites). <br />• Broadleaf weed control (contracted). <br />Applied to athletic fields at CMS, RLE, Sunrise and Highland Meadows turf areas. <br />• Added rec. step (wood mulch) to playgrounds as needed. <br />• Picked up and delivered party wagon. <br />• Irrigation system audits: <br />Checked all systems to determine maintenance needs. Example: <br />Heads — spray pattern rotating properly - raise /lower. <br />Valve boxes — locate, raise /lower, replace as needed. <br />• Assisted Recreation Department with Safety Camp and playground party set -up. <br />• Assisted Environmental Department with watering trees and oak wilt control. <br />• Core aerated athletic fields at CMS, RLE, and Sunrise. <br />• Leveled BMX track in S. Reshanau trail area. Cut Buckthorn and stump treated, left <br />Buckthorn lay to discourage rebuilding of BMX track. <br />• Equipment maintenance as needed. <br />Those are the highlights from August and September. Hopefully we will be caught up soon. <br />sw /parkbrd /Mike /August- September 2004 Park Update.doc <br />