My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/02/2005 Park Board Other
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2005 Park Board Packets
>
05/02/2005 Park Board Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:47:57 AM
Creation date
7/9/2014 9:35:56 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Other
Meeting Date
05/02/2005
Park Bd Meeting Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Public Services Department <br />CITY.: ,' :;°✓ 3 O F 600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />• www.ci.lino- lakes.mn.us <br />April 22, 2005 <br />Dear Birchwood Acres Park Adjoining Property Owner, <br />In July 2004, I sent you a letter regarding some improvements peraining to Birchwood <br />Acres Park. Listed below is a summary of work that will be performed over the next <br />several weeks: <br />o Water service will be brought into the park for irrigation. This will require the <br />removal and replacement of a portion of trail near the eastern entrance of the <br />park near Fox Road. The trails near the work site will be barricaded off during <br />the duration of this project. <br />o The open play area (grass) around the ball field area will be completely <br />renovated to provide a safer environment for park users. This includes stripping <br />off and hauling away the existing vegetation, rough and final grading the site, <br />installing an irrigation system, and seeding. <br />o The infield area of the ball field will be replaced with ag -lime. A new backstop will <br />also be installed. To reinforce the fact that the design and intent of this ball field <br />is for informal use only, the player benches will be not be replaced. Also, a <br />pitcher's mound and base pegs will not be installed. Staff will also be <br />communicating with the various youth sports associations to further strengthen <br />our commitment that Birchwood Acres Park will not be used for any formal <br />games or scrimmages. Rather, area residents and youth teams will use the field <br />for informal activities and practices. <br />There have been some inquiries related to water fountains. We do not place water <br />fountains in our neighborhood parks due to the high cost of the fountains and constant <br />maintenance needed to keep them operational. <br />The stripping off and hauling away the existing vegetation are scheduled to begin as <br />early as next week. The removal of the trail may begin toward the end of next week. <br />The water service work is scheduled to begin the week of May 2nd. Our intent is to have <br />the entire project completed by the end of May. City staff is confident that these <br />improvements will make Birchwood Acres Park much more useable and enjoyable for <br />area residents. <br />Sincerely, <br />7CA <br />• Rick DeGardne <br />Public Services Director <br />J: \Ricks Folder \Parks Division \Neighborhood Parks \Birchwood Acres \Renovation update to residents 4- 22- 05.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.