My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/06/2005 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2005 Park Board Packets
>
06/06/2005 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:47:37 AM
Creation date
7/9/2014 9:38:42 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
06/06/2005
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />• <br />May 25, 2005 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: May 2005 Maintenance Update <br />Well, a cool, wet May is almost behind us. One positive of the cool temps is that the grass hasn't <br />been growing out of control and we've been able to keep up with it pretty well. Seasonal staff <br />are all on board now and that will definitely help us get caught up with some of the projects <br />we've been neglecting. <br />Projects during a hectic May have included: <br />❖ Weekly mowing of all park locations. <br />❖ Weekly garbage collection at all parks. <br />❖ Attended ball field maintenance seminar. <br />❖ Cut, chipped and stump ground 25 diseased boulevard trees for Forestry Department. <br />❖ Planted 25 replacement trees for Forestry Department. <br />❖ Planted 53 replacement and new park trees at various locations. <br />❖ Planted 30 replacement shrubs at Clearwater Creek Park. <br />❖ Watered in plant materials as needed. <br />❖ Removed graffiti from Sunrise Park playground equipment. <br />❖ Daily ball field game preparation. We are averaging 8 -10 game preparations per day. <br />❖ Installed two "no motorized vehicle" signs at Behm's Park trail heads. <br />❖ Moved 60+ prairie plants from Town Center construction site to Behm's Park and Town <br />Center prairie areas. <br />❖ Installed 40' split rail fencing along trail behind 560 Arrowhead Drive. (kids cutting <br />corner through yard.) <br />❖ Applied pre- emergent and roundup to shrub beds at Clearwater Creek Park. <br />❖ Soccer field maintenance <br />• Line cut -ins, hang nets, repaint lines as necessary. <br />❖ Equipment maintenance as needed. (change, sharpen blades, grease) <br />••• Arena Acres tennis courts <br />• Sealed and painted major cracks in court surface, installed new nets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.