My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/05/2005 Park Board Other
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2005 Park Board Packets
>
07/05/2005 Park Board Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:46:54 AM
Creation date
7/9/2014 9:43:54 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Other
Meeting Date
07/05/2005
Park Bd Meeting Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />June 29, 2005 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: June 2005 Maintenance Update <br />Well, the cool, wet May I wrote about last month has given way to a warm, wet June which of <br />course means the grass is growing like crazy and keeping up with the mowing has been a <br />challenge. <br />Maintenance activity during a busy June has included: <br />• Mowing of all park areas — we have been trying to cut our irrigated turf areas twice a <br />week but the wet weather has not allowed us to get to everything. As a result, we are <br />leaving excess clippings in some areas. <br />• Weekly garbage collection at all parks and park shelters. <br />• Daily athletic field preparation — we are averaging over 10 ball field game preps per <br />day Monday thru Thursday. Also weekly line cut -ins and painting. <br />• Completed playground inspections and repairs. Vandalized playgrounds that were <br />repaired included: <br />o Highland Meadows Park — repaired floating balance beam. <br />o Lino Park — replaced damaged crawl tube section and repaired tire swing. <br />o Birchwood Acres, Behms and Birch Park — removed graffiti. <br />• Repaired damaged picnic tables. <br />• Repaired stage at Sunrise Park. <br />• Poured concrete pads and installed bike racks at Lino Park and Town Center. <br />• Equipment maintenance and repair as needed. <br />• Sherman Lake Road Trail — installed 72' of retaining wall (48' on west side, 24' on <br />east side) where culverts cross trail to prevent washout of trail. Removed Buckthorn <br />from trail edges to improve visibility. <br />• Repaired boardwalk behind homes on Stagecoach Trail 20' of railing had been <br />vandalized. <br />• Party wagon deliveries and pickups. <br />• Broadleaf week control to soccer fields at CMS and RLE. <br />• Aerified soccer fields at CMS and RLE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.