My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/05/2007 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2007 Park Board Packets
>
02/05/2007 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:17:56 AM
Creation date
7/9/2014 12:21:54 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/05/2007
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />January 30, 2007 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: December 2006 and January 2007 Park Maintenance Update <br />Maintenance activities during the months of December and January have included the following: <br />➢ Equipment maintenance and repair. <br />➢ Rink maintenance — What a weird winter, we had skateable ice by December 8th but then <br />an extended warm period hit and we were unable to do much flooding until the week of <br />January 8th. All rinks are finally in pretty good shape. The weatherman is calling for <br />below normal temps for the next week or so, so we should be able to build some base and <br />hopefully keep them looking good well into February. <br />➢ Hockey goal maintenance — Repaired goals and nets as needed. <br />➢ Building maintenance <br />- Cleaned warming houses as needed. <br />Fabricated, painted and installed window guards at City Hall warming house. <br />- Purchased and installed rubber flooring for City Hall shelter. <br />➢ Picked up and stored football equipment. <br />➢ Plowed streets, trails and parking lots as needed. <br />➢ Attended Green Expo (educational seminar and trade show). <br />➢ Cleaned, repaired and prepped wood duck houses for spring 2007 use. <br />➢ Chipped Christmas trees at Sunrise and Birch Park sites (approx. 150 total). <br />➢ Brandywood Park <br />- Cut, chipped and stump treated Buckthorn (approximately 45 cubic yards of <br />chipped materials). Also removed numerous dead and hazardous trees. <br />➢ Country Lakes Park <br />- Cut, chipped and stump treated Buckthorn (removed approximately 40 cubic <br />yards of chipped materials). <br />➢ Tree and shrub pruning at Sunrise Park. <br />➢ Shenandoah Park <br />- Removed approximately 20 trees (15 Cottonwood, 5 Box Elder) from front <br />boulevard. Our plan is to stump grind all stumps, construct a low berm (12" — <br />18") and replant area using 4 existing Hackberry, tree spaded to new locations and <br />also some bare root Red Oaks, as well as a maintained turf boulevard. <br />Removed 5 hazardous trees from wooded areas near picnic table and playground. <br />- Trimmed branches to allow for mower clearance. <br />Those are the major highlights from December and January - more to come in February. <br />sw /parkbrd /Mike /December 2006 and January 2007 Park Maintenance Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.