My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/05/2007 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2007 Park Board Packets
>
11/05/2007 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:11:02 AM
Creation date
7/9/2014 12:58:54 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/05/2007
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino- lakes.mn.us <br />October 23, 2007 <br />TO: Park Board Members <br />FROM: Mike Hoffrnan, Parks Supervisor <br />SUBJECT: June — September Maintenance Update <br />I can't believe I haven't written an update since May. I guess I have some catching up to do. <br />Maintenance highlights for the months of June — September have included the following: <br />June <br />✓ Ball fields — daily maintenance and game preparation. <br />✓ Garbage collection. <br />✓ Daily equipment maintenance and repairs. <br />✓ Sunrise Field #2 — added an additional irrigation head to dry area in right field. <br />✓ Water park trees as needed. <br />✓ Sod cut and mulched around park trees (approximately 6' diameter). <br />✓ Applied weed control around park trees (post and pre- emergent chemical). <br />✓ Installed fishing dock at Country Lakes Park. <br />✓ Repaired picnic tables. <br />✓ Cleaned park buildings. <br />✓ Irrigation system maintenance at Clearwater Creek Park, Town Center, and Sunrise Park. <br />✓ Fertilized 40+ acres of irrigated turf. <br />✓ Line cut -ins and painting of soccer, lacrosse, and ball fields. <br />✓ Edged concrete fence line aprons at CMS, #1, 2, 3, 4 and 5. <br />✓ CMS #2 infield renovation. <br />✓ Playground inspections and repairs. <br />✓ Lino Park — Removed backstop, bleachers, players benches and concrete pads. <br />July <br />o Daily ball field game preparation and maintenance. <br />o Watered young park trees as needed. <br />o Hazard tree removal at Country Lakes Park and Timberwolf Trail. <br />o Playground repairs — replaced damaged timbers, swing chain and s- hooks. <br />o Mulched park trees. <br />o Arena Acres — installed concrete pad and park bench near playground. <br />o Delivered metal picnic tables to Community Green. <br />o Irrigation system repairs. <br />o Mowing, garbage collection, and equipment maintenance as needed. <br />o Lino Park — tree and stump removal of 30+ Green Ash trees for park re- design project. <br />o Rec -step top -offs at Arena Acres, Highland Meadows and Brandywood playground sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.