August <br />• Mowing, garbage collection and equipment maintenance as needed. <br />• Assisted Recreation Department with Safety Camp set -up. <br />• Storm damage clean-up of parks, trails and streets. <br />• Fall soccer and football field preparation, field layout and painting, move goals, hang <br />nets, and anchor. <br />o Football: 3 game fields and 8 practice fields. <br />o Soccer — 15 fields. <br />• Sweep trails. <br />• Playground inspections and repairs. <br />• Lino Park — Site grading and trail layout and basing. <br />September <br />❖ Park mowing when and where we can. Some areas are too wet to mow. <br />• Garbage collection and equipment maintenance as needed. <br />❖ Fertilized 45 acres of athletic fields and irrigated turf. <br />• Assisted Environmental Coordinator with Oak Wilt control work. (vibratory plow <br />operator for 1 week) <br />• Tear off and re -roof Birch Park warming house. This building also needs siding, <br />windows, and doors which we plan on replacing next spring. <br />❖ Assisted Utilities with hydrant flushing. <br />❖ Soccer and football field maintenance (line cut -ins and painting, goal and net <br />maintenance). <br />••• Lino Park <br />• <br />o Trail install (contracted). <br />o Irrigation install (contracted). <br />o Poured 10'x10' concrete slab for irrigation shed. <br />o Seed bed prepared and seeded. <br />What a summer and fall it has been. First extremely dry in June, July and early August, which <br />kept us busy watering young trees and plants. Then the rains began and it seems like it hasn't <br />stopped raining since. It has been the wettest August, September and October in the Twin Cities <br />ever — a record breaker. There are park and school sites that we haven't been able to mow for <br />over 2 weeks and I'm not sure we will be able to get equipment on them until spring. <br />Unfortunately the wet weather doesn't stop the soccer and football teams from practicing and <br />playing games so our work will be cut out for us when those seasons finally end on the weekend <br />of October 27 — 28. <br />The wet weather has also been a major setback to the progress at Lino Park. The original plan <br />was for site work to be completed by August 24, the irrigation system, to be installed by <br />September 4 and our crew to have the park seeded by September 7. Due to all the weather <br />delays the park was not seeded until September 28. Unfortunately due to heavy rains the week <br />of October 1 much of the seed was washed away along with some soil. <br />I will update you on the progress at Lino Park in the October Update. <br />• <br />