My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/28/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
04/28/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 3:27:22 PM
Creation date
7/11/2014 10:37:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/28/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dairy Queen Chill and Grill Page 2 March 6, 2003 <br />City of Lino Lakes, Minnesota <br />hours, etc.), this may create congestion and safety concerns. It is recommended that the Owner address this <br />issue further. In addition, it is recommended that the drive- through exit be extended slightly further south <br />(eliminating one parking space), to route exiting traffic through the parking lot more uniformly. <br />Comments - Drainage Review and Calculations <br />Hydro -Cad calculations have been reviewed and accepted. The proposed site is included within the greater <br />area of the Lino Lakes Market Place Master Plan, which was previously reviewed and approved by the Rice <br />Creek Watershed District. The proposed Dairy Queen Chill and Grill site generally meets the concept design <br />presented in the permit previously approved. <br />Grading, Drainage, and Erosion Control <br />1. The site area is approximately 1 acre in size. Although the site area has already been approved by <br />Rice Creek Watershed District, erosion control measures will be required, and are addressed on the <br />plans. <br />2. Under note 7, the Contractor shall provide a sweeper to clean streets and paved areas outside of the <br />project site on a daily basis as needed. <br />3. The Contractor shall confine all work activity, including storage of equipment and materials, to the <br />site area itself. The Contractor's activity shall not impede or impact traffic access for other <br />businesses and through traffic in the immediate area. All adjacent streets and access drives shall be <br />kept clear at all times. <br />Utilities <br />1. The proposed site improvements will be connected to either in place utilities or utilities constructed <br />as part of the overall Lino Lakes Marketplace Plan. The Chill and Grill utility plan shows a <br />combination of existing and proposed sanitary sewer, storm sewer, and water facilities. These <br />utilities are not clearly defined as to which are existing and proposed, and whose responsibility it is to <br />construct them. It does appear that all necessary supporting existing infrastructure has been <br />constructed and is in place. . <br />2. A note must be added that the City of Lino Lakes Utility Supt. Shall be contacted at least 48 hours <br />prior to any utility work, utility connections, or any work in the public right of way performed. <br />3. A note must be added that all sanitary sewer and water main installed as part of this project shall be <br />installed, tested and accepted per the requirements of the City of Lino Lakes, Specifications of the <br />City Engineers Association of Minnesota, the Minnesota Department of Health, and the Minnesota <br />Pollution Control Agency as required. Sanitary Sewer service pipe shall be SDR 26 or SCH 40 and <br />ductile iron water.pipe shall be CL 52. Gate Valves shall be Mueller A- 2370 -20 with mechanical <br />joints, meeting AWWA Specifications C500 -61. Valve Boxes shall be Mueller H -10357 with H- <br />10361 drop lid and extensions shall be Mueller H- 10363. <br />
The URL can be used to link to this page
Your browser does not support the video tag.