Hailey Manor Page 4 August 26, 2003 <br />City of Lino Lakes, Minnesota <br />and provided as required by the City of Lino Lakes. A separate detail sheet showing all applicable <br />standard plates of the City of Lino Lakes shall be provided. <br />2. Sanitary sewer and watermain system materials and installation methods shall follow the City of Lino <br />Lakes engineering standards. A utility plan with notes referring to City of Lino Lakes and CEAM <br />details and other pertinent construction notes must be provided. <br />3. The Developer shall provide to the City of Lino Lakes a copy of the completed MPCA Sanitary <br />Sewer Permit, including correspondence and approval of Metropolitan Council Environmental <br />Services (MCES). The Developer shall provide to the City of Lino Lakes a copy of the completed <br />MDH permit for watermain installation. <br />4. Utility installations shall be installed in accordance with the recommendations of the geotechnical <br />analysis and report. <br />5. It appears that this development proposes to construct new single - family homes with City utilities <br />while retaining some existing homes that are currently served by well and septic systems. It is <br />expected that any existing homes to remain as part of this project will be connected to City sewer and <br />water, and shall have existing septic and wells removed and capped accordingly per MPCA and <br />MDH standards. The developer shall be responsible for addressing these issues as may be required <br />with the appropriate regulatory agency. The developer shall also be aware that the Minnesota <br />Department of Health has very specific rules regarding the minimum distance that a sanitary sewer <br />may be placed from and existing well (50 feet for sewer mains and 20 feet for services). The <br />developer shall address these issues with the State accordingly prior to approval of final construction <br />plans and commencement of any construction activity. <br />6. Profile sheets must be provided for sewer and watermain installation on Lois Lane. <br />Other Comments <br />1. The Contractor shall adhere to working hours for construction activities in accordance with the <br />requirements of the City of Lino Lakes. <br />2. A note must be added that the City of Lino Lakes Utility Superintendent shall be contacted at least 48 <br />hours prior to any utility work, utility connections, or any work in the public right -of -way being <br />performed. <br />