My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/08/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
09/08/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2014 5:01:45 PM
Creation date
7/14/2014 12:05:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruggeman <br />page 9 <br />stucco, and/or natural or artificial stone. No single building facade shall have more than <br />75% of one type of exterior finish, except for brick, stucco, or stone. The structures are <br />not consistent with these requirements. <br />Resubmitted elevations include additional detailing: stone veneer around the base of the <br />buildings, shutters on the second floor windows, and moldings in the patio doors. There <br />also is a small penthouse for sprinkler equipment on building ends. <br />The ordinance states that townhomes without basements must have garages of 540 sf. <br />The floor plans indicate that the garages do not meet this requirement, though they are <br />two -car garages similar in size to other townhomes in the community. <br />Purposes of a PUD include "innovation that address growing demands for all styles of <br />economic expansion, greater variety in type, design, architectural standards" and the <br />purposes of an urban PUD include "a variety of urban residential lot sizes, <br />configurations, and neighborhoods." <br />As with all townhome developments, a homeowners' association will be needed. By <br />laws must be reviewed by the City Attorney prior to final plat consideration. <br />Commercial: The commercial building exterior includes a stone base, painted "hardi- <br />plank" lap siding, vinyl shakes on the gable ends, and prehung vinyl windows. <br />Decorative painted wood columns and a small trellis along the roof line add some detail. <br />The materials generally match those proposed for the residential structures. The building <br />meets the commercial building materials requirements. <br />The building elevation shows a painted wood sign band. The sign plan submitted August <br />28, 2003, shows this sign band as EIFS. The EIFS is acceptable, and must be <br />incorporated into the building design. The signage plan addresses the needed information <br />and is acceptable. The only missing information is the location of the commercial <br />monument sign. This can be reviewed with the sign permit application. <br />ShoreIand: The western portion of the site is within 1000' of the ordinary high water <br />level of Baldwin Lake, which puts it in the shoreland overlay. The issue here is <br />impervious surface. For commercial development in a shoreland, the impervious <br />maximum is 60 %. The commercial area is 59% impervious. The residential maximum is <br />35 %, and the residential area within the shoreland is 30 %. <br />Streets: One important criteria for new development is whether or not the project <br />is premature due to inadequate transportation infrastructure. If the infrastructure is <br />inadequate, it must be improved to ensure it can accommodate the new development. As <br />explained here, major improvements to the surrounding roadways are necessary to <br />accommodate the project. These improvements would occur with the project. The <br />improvements would serve to correct an undesirable pre- existing situation as well <br />Site Access Points: The plan includes three accesses to surrounding roadways: <br />
The URL can be used to link to this page
Your browser does not support the video tag.