My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/13/2003 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2003
>
10/13/2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 1:40:09 PM
Creation date
7/14/2014 2:55:16 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/13/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apollo Center Page 2 August 7, 2003 <br />City of Lino Lakes, Minnesota <br />6. The majority of the site drainage is proposed to be directed to an existing storm sewer located <br />southwest of the site. This routing should be verified against a comprehensive drainage study of the <br />area previously conducted by the City of Lino Lakes, and any additional requirements of the Rice <br />Creek Watershed District. <br />7. Apollo Drive is a County (Anoka) roadway(CSAH 12). The plans provide for the extension of <br />utilities and excavation into Apollo Drive. A permit will be required from Anoka County, and all <br />work including excavation, restoration, and traffic control shall meet the requirements of the County. <br />The plans shall include notes to address Anoka County requirements. <br />Grading <br />1. Because the site area exceeds one acre, the development falls under the new rules requiring an <br />NPDES permit. The developer shall be responsible for obtaining this permit. Silt fence and erosion <br />control measures are provided on the plan. <br />2. A typical section (pavement section) must be provided for the parking area driveways (bituminous <br />thickness, gravel base thickness, etc.). <br />3. Any imported topsoil, fill material, or granular materials for roadway and building foundation <br />(material and source) must be approved by the City Engineer. <br />,44. A note shall be provided that any clearing of trees shall be performed in accordance with the <br />requirements of Mn/DOT 2101. <br />5. A Landscaping Plan must be provided in accordance with City requirements. <br />6. Note 4 on the Utility Plan shall be supplemented to read, "All utility work shall be performed in <br />accordance with the City of Lino Lakes, City Engineers Association of Minnesota (CEAM) <br />Specifications, and building permit requirements." <br />7. A note shall be added stating that, "Turf shall be immediately established upon the completion of all <br />grading work. Turf establishment shall be provided per Mn/DOT specification for sod turf <br />establishment (2575) and for the seed mixture specified (3876), or City of Lino Lakes seed <br />specification as appropriate." <br />8. All grading shall be confined to the property. No additional runoff from the site shall enter upon <br />neighboring properties. If grading requires any work into the adjoining property, the Contractor shall <br />be responsible for obtaining authorization as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.