<br />ESTIMATE NO. 8 (FINAL)
<br />LAKE DRIVE/APOLLO DRIVE
<br />CITY OF LINO LAKES, MINNESOTA
<br />COMMISSION NO. 12426 -01
<br />ITEM MnDOT
<br />NO. NO. DESCRIPTION
<br />72 2533.603 RELOCATE CONCRETE MEDIAN BARRIER
<br />73 2545.602 INSTALL SALVAGED LIGHTING UNIT
<br />74 2563.601 TRAFFIC CONTROL, PHASE 1
<br />75 2563.601 TRAFFIC CONTROL, PHASE 2
<br />76 2563.601 TRAFFIC CONTROL, PHASE 3
<br />77 2564.531 SIGN PANELS TYPE C
<br />78 2564.531 SIGN PANELS TYPE D
<br />79 2564.537 INSTALL SIGN TYPE C
<br />80 2564.537 INSTALL SIGN TYPE D
<br />81 2564.55 DELINEATOR TYPE CYLINDER STYLE
<br />82 2564.55 DELINEATOR TYPE (X4-2)
<br />83 2564.602 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM
<br />84 2564.602 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM
<br />85 2564.602 PAVT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM
<br />86 2564.603 4" SOLID LINE WHITE -PAINT
<br />87 2564.603 24" SOLID LINE WHITE -POLY PREFORMED
<br />88 2654.603 4' BROKEN LINE WHITE -PAINT
<br />89 2654.603 4" SOLID LINE YELLOW -PAINT
<br />90 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT
<br />91 2564.603 8" BROKEN LINE WHITE -PAINT
<br />92 2564.603 24" SOLID LINE YELLOW -POLY PREFORMED
<br />93 2564.618 ZEBRA CROSSWALK WHITE -POLY PREFORMED
<br />94 2565.511 FULL T ACT T CONTROL SIGNAL SYSTEM A
<br />95 2565.511 FULL T ACT T CONTROL SIGNAL SYSTEM B
<br />96 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM A
<br />97 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM B
<br />98 2565.601 TRAFFIC CONTROL INTERCONNECTION
<br />99 2573.501 BALE CHECK AT CATCH BASIN
<br />100 2573.603 SILT FENCE, TYPE MACHINE SLICED
<br />101 2575.501 SEEDING, MIXTURE 60B
<br />102 2575.505 SODDING, TYPE SALT RESISTANT
<br />SUBTOTAL ESTIMATE NO. 8 (FINAL)
<br />PERIOD ENDING: November 30, 2003
<br />CONTRACT QUANTITY UNIT AMOUNT
<br />UNIT QUANTITY TO DATE PRICE TO DATE
<br />LF 1,000 - $ 2.00 $ -
<br />EA 1 1.0 $ 1,400.00 $ 1,400.00
<br />LS 1 1.0 $ 9,000.00 $ 9,000.00
<br />LS 1 1.0 $ 8,000.00 $ 8,000.00
<br />LS 1 1.0 $ 7,000.00 $ 7,000.00
<br />SF 428 428.0 $ 22.00 $ 9,416.00
<br />SF 42.3 42.3 $ 28.00 $ 1,184.40
<br />EA 1 1.0 $ 95.00 $ 95.00
<br />EA 2 2.0 $ 95.00 $ 190.00
<br />EA 2 - $ 25.00 $ -
<br />EA 8 - $ 35.00 $ -
<br />EA 13 13.0 $ 150.00 $ 1,950.00
<br />EA 11 11.0 $ 150.00 $ 1,650.00
<br />EA 2 2.0 $ 225.00 $ 450.00
<br />LF 8,104 12,012.0 $ 0.14 $ 1,681.68
<br />LF 377 357.0 $ 11.00 $ 3,927.00
<br />LF 710 820.0 $ 0.14 $ 114.80
<br />LF 6,316 11,437.0 $ 0.14 $ 1,601.18
<br />LF 455 1,127.0 $ 0.28 $ 315.56
<br />LF 81 - $ 0.50 $
<br />LF 170 150.0 $ 12.00 $ 1,800.00
<br />SF 1,062 1,044.0 $ 8.00 $ 8,352.00
<br />SIG SYS 1.00 1.03 $ 151,000.00 $ 155,530.00
<br />SIG SYS 1.00 1.0 $ 122,000.00 $ 122,000.00
<br />LS 1.00 1.0 $ 3,700.00 $ 3,700.00
<br />LS 1.00 1.0 $ 3,200.00 $ 3,200.00
<br />LS 1.00 1.0 $ 3,900.00 $ 3,900.00
<br />EA 50.00 - $ 8.00 $
<br />LF 3,000.00 1,320.0 $ 1.00 $ 1,320.00
<br />ACRE 0.70 0.9 $ 2,000.00 $ 1,860.00
<br />SY 14,000.00 15,672.0 $ 1.80 $ 28,209.60
<br />$ 1,465,020.54
<br />$ 1,465,020.54
<br />CHANGE ORDER NO. 1
<br />1 ADDITIONAL TRAFFIC CONTROL PER ANOKA COUNTY LS 1.0 1.0 $ 16,940.00 $ 16,940.00
<br />2 ADDITIONAL SIGNS FOR SIGNALS PER ANOKA COUNTY LS 1.0 1.0 $ 739.75 $ 739.75
<br />3 POND CONSTRUCTION AS REQUIRED BY RICE CREEK
<br />WATERSHED DISTRICT LS 1.0 1.0 $ 9,020.00 $ 9,020.00
<br />CHANGE ORDER NO. 1 $ 26,699.75
<br />TOTAL ESTIMATE NO. 8 (FINAL) $ 1,491,720.29