Laserfiche WebLink
• <br />• <br />• <br />ESTIMATE NO. 8 (FINAL) <br />LAKE DRIVE/APOLLO DRIVE <br />CITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12426 -01 <br />ITEM MnDOT <br />NO. NO. DESCRIPTION <br />72 2533.603 RELOCATE CONCRETE MEDIAN BARRIER <br />73 2545.602 INSTALL SALVAGED LIGHTING UNIT <br />74 2563.601 TRAFFIC CONTROL, PHASE 1 <br />75 2563.601 TRAFFIC CONTROL, PHASE 2 <br />76 2563.601 TRAFFIC CONTROL, PHASE 3 <br />77 2564.531 SIGN PANELS TYPE C <br />78 2564.531 SIGN PANELS TYPE D <br />79 2564.537 INSTALL SIGN TYPE C <br />80 2564.537 INSTALL SIGN TYPE D <br />81 2564.55 DELINEATOR TYPE CYLINDER STYLE <br />82 2564.55 DELINEATOR TYPE (X4-2) <br />83 2564.602 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM <br />84 2564.602 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM <br />85 2564.602 PAVT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM <br />86 2564.603 4" SOLID LINE WHITE -PAINT <br />87 2564.603 24" SOLID LINE WHITE -POLY PREFORMED <br />88 2654.603 4' BROKEN LINE WHITE -PAINT <br />89 2654.603 4" SOLID LINE YELLOW -PAINT <br />90 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT <br />91 2564.603 8" BROKEN LINE WHITE -PAINT <br />92 2564.603 24" SOLID LINE YELLOW -POLY PREFORMED <br />93 2564.618 ZEBRA CROSSWALK WHITE -POLY PREFORMED <br />94 2565.511 FULL T ACT T CONTROL SIGNAL SYSTEM A <br />95 2565.511 FULL T ACT T CONTROL SIGNAL SYSTEM B <br />96 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM A <br />97 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM B <br />98 2565.601 TRAFFIC CONTROL INTERCONNECTION <br />99 2573.501 BALE CHECK AT CATCH BASIN <br />100 2573.603 SILT FENCE, TYPE MACHINE SLICED <br />101 2575.501 SEEDING, MIXTURE 60B <br />102 2575.505 SODDING, TYPE SALT RESISTANT <br />SUBTOTAL ESTIMATE NO. 8 (FINAL) <br />PERIOD ENDING: November 30, 2003 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />LF 1,000 - $ 2.00 $ - <br />EA 1 1.0 $ 1,400.00 $ 1,400.00 <br />LS 1 1.0 $ 9,000.00 $ 9,000.00 <br />LS 1 1.0 $ 8,000.00 $ 8,000.00 <br />LS 1 1.0 $ 7,000.00 $ 7,000.00 <br />SF 428 428.0 $ 22.00 $ 9,416.00 <br />SF 42.3 42.3 $ 28.00 $ 1,184.40 <br />EA 1 1.0 $ 95.00 $ 95.00 <br />EA 2 2.0 $ 95.00 $ 190.00 <br />EA 2 - $ 25.00 $ - <br />EA 8 - $ 35.00 $ - <br />EA 13 13.0 $ 150.00 $ 1,950.00 <br />EA 11 11.0 $ 150.00 $ 1,650.00 <br />EA 2 2.0 $ 225.00 $ 450.00 <br />LF 8,104 12,012.0 $ 0.14 $ 1,681.68 <br />LF 377 357.0 $ 11.00 $ 3,927.00 <br />LF 710 820.0 $ 0.14 $ 114.80 <br />LF 6,316 11,437.0 $ 0.14 $ 1,601.18 <br />LF 455 1,127.0 $ 0.28 $ 315.56 <br />LF 81 - $ 0.50 $ <br />LF 170 150.0 $ 12.00 $ 1,800.00 <br />SF 1,062 1,044.0 $ 8.00 $ 8,352.00 <br />SIG SYS 1.00 1.03 $ 151,000.00 $ 155,530.00 <br />SIG SYS 1.00 1.0 $ 122,000.00 $ 122,000.00 <br />LS 1.00 1.0 $ 3,700.00 $ 3,700.00 <br />LS 1.00 1.0 $ 3,200.00 $ 3,200.00 <br />LS 1.00 1.0 $ 3,900.00 $ 3,900.00 <br />EA 50.00 - $ 8.00 $ <br />LF 3,000.00 1,320.0 $ 1.00 $ 1,320.00 <br />ACRE 0.70 0.9 $ 2,000.00 $ 1,860.00 <br />SY 14,000.00 15,672.0 $ 1.80 $ 28,209.60 <br />$ 1,465,020.54 <br />$ 1,465,020.54 <br />CHANGE ORDER NO. 1 <br />1 ADDITIONAL TRAFFIC CONTROL PER ANOKA COUNTY LS 1.0 1.0 $ 16,940.00 $ 16,940.00 <br />2 ADDITIONAL SIGNS FOR SIGNALS PER ANOKA COUNTY LS 1.0 1.0 $ 739.75 $ 739.75 <br />3 POND CONSTRUCTION AS REQUIRED BY RICE CREEK <br />WATERSHED DISTRICT LS 1.0 1.0 $ 9,020.00 $ 9,020.00 <br />CHANGE ORDER NO. 1 $ 26,699.75 <br />TOTAL ESTIMATE NO. 8 (FINAL) $ 1,491,720.29 <br />