Laserfiche WebLink
Planning & Zoning Board <br />January 12, 2000 <br />Page 5 <br />• Mr. Johnson made a MOTION to approve minor subdivision and variance based on the <br />following conditions: <br />1. <br />The applicant provide a current survey of the two new parcels. The lot <br />containing the dwelling shall be one acre in size with 227' of lot frontage and <br />configured as indicated on sketch B, which is attached. The vacant parcel shall be <br />combined into one 4+ acre parcel. <br />2. The applicant shall provide documentation that there is an alternate site for a <br />septic system on the existing homesite should the existing system fail. <br />3. Park Dedication shall be required for any new construction on the larger parcel <br />per the Subdivision Ordinance. <br />The MOTION was supported by Mr. Rafferty. Motion carrie <br />This item will go before the Council Monday, January <br />p• <br />A. PUBLIC HEARING, (Continue t eb , 2000, Shiloh Church, <br />Main Street, Conditional Use Permit <br />Staff recommended the public hearing be + : d continued to the February 9, 2000, <br />Planning and Zoning Board meeting. <br />Chair Schaps declared the publi o ��� at 7:05 p.m. <br />Mr. Corson made a MOTI <br />Planning and Zoning B <br />0. <br />D. PUBLIC <br />Permit and Zonin <br />ntinue the public hearing to the February 9, 2000, <br />, and was supported by Ms. Lane. Motion carried 7- <br />G, Shafer Contracting, 7504 Lake Drive, Conditional Use <br />rdinance Text Amendment <br />Staff advised Shafer Contracting has received the contract for concrete pavement <br />resurfacing on 35W from MnDOT. This work is scheduled to take place between April <br />and June /July of 2000. The project area is from Sunset Road north easterly to the <br />35W/35E junction. Shafer Contracting would like to set up their batch plant on the Tagg <br />property (Artic Sandblasting) at 7504 Lake Drive. Temporary, portable concrete batch <br />plants are needed to conform to MnDOT's specifications /limits for concrete placement <br />within 30 minutes of production. This location will provide quick access, reduce traffic <br />conflicts with hauling trucks, eliminate the need for Shafer to dismantle and relocate their <br />plant during resurfacing, and provide timely completion of the project. They have signed <br />a lease agreement with the property owner. <br />• <br />