Laserfiche WebLink
• <br />Planning & Zoning Board <br />October 11, 2000 <br />Page 9 <br />6. Final utility, grading, and drainage plans must obtain approval from the City <br />Engineer and Rice Creek Watershed District. <br />7. All permits required by the Rice Creek Watershed District shall be obtained prior <br />to any site grading. <br />8. Proper building permits must be obtained prior to any construction and 1% of the <br />construction costs must be put in escrow to insure completion of all site <br />improvements. <br />9. Site plan approval does not imply approval of signage. Any signage shall <br />conform to the sign ordinance and proper permits obtained. <br />10. Park dedication applies per City policy. <br />11. Minor subdivision shall be as shown on submitted sketch and description <br />including easements per RCWD requirements and the City Engineer's report. <br />The motion was supported by Mr. Johnson. Motion carried 6 -0. <br />Mr. Zych excused himself from the meeting at 7:45 p.m. <br />VI. DISCUSSION ITEMS <br />A. Town Center Standards <br />Staff advised the Town Center Committe Li akes citizens recommended special <br />design standards for the Town Center ��* 19' The draft standards prepared by <br />Calthorpe and Associates builds o ee's framework. The standards will put <br />into effect the vision for a Tow as formulated several years ago. The City <br />Council endorsed the drafts ugust 28, 2000. Final approval will include <br />rezoning the land as well ng the zoning ordinance to create a new zoning <br />district and adopt the d tandards for it. <br />As the discussion s u t is clear that confusion still exists over the need for <br />development stan �' �£ =e draft standards include more detail than the City is <br />accustomed to seem w °z The City is accustomed to seeing standards for minimum setbacks <br />and maximum buildi g heights: but maximum setbacks and minimum building heights is <br />a switch. Though many cities have architectural standards regarding building materials, <br />we are not accustomed to this in Lino Lakes. Additional architectural standards are even <br />more disconcerting for some people here. <br />A public hearing will be held for the zoning amendment action, but it has not been <br />scheduled to date. Before the City does that, it is a good idea to revisit the Town Center <br />vision. Mary Divine, the City's Economic Development Assistant, has prepared a <br />presentation to demonstrate the need for the design standards. <br />Ms. Divine presented a slide show relating to traditional neighborhood developments and <br />• the need for design standards. <br />