My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/11/2000 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2000
>
10/11/2000 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 12:06:43 PM
Creation date
7/15/2014 11:02:00 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
10/11/2000
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Planning & Zoning Board <br />October 11, 2000 <br />Page 9 <br />6. Final utility, grading, and drainage plans must obtain approval from the City <br />Engineer and Rice Creek Watershed District. <br />7. All permits required by the Rice Creek Watershed District shall be obtained prior <br />to any site grading. <br />8. Proper building permits must be obtained prior to any construction and 1% of the <br />construction costs must be put in escrow to insure completion of all site <br />improvements. <br />9. Site plan approval does not imply approval of signage. Any signage shall <br />conform to the sign ordinance and proper permits obtained. <br />10. Park dedication applies per City policy. <br />11. Minor subdivision shall be as shown on submitted sketch and description <br />including easements per RCWD requirements and the City Engineer's report. <br />The motion was supported by Mr. Johnson. Motion carried 6 -0. <br />Mr. Zych excused himself from the meeting at 7:45 p.m. <br />VI. DISCUSSION ITEMS <br />A. Town Center Standards <br />Staff advised the Town Center Committe Li akes citizens recommended special <br />design standards for the Town Center ��* 19' The draft standards prepared by <br />Calthorpe and Associates builds o ee's framework. The standards will put <br />into effect the vision for a Tow as formulated several years ago. The City <br />Council endorsed the drafts ugust 28, 2000. Final approval will include <br />rezoning the land as well ng the zoning ordinance to create a new zoning <br />district and adopt the d tandards for it. <br />As the discussion s u t is clear that confusion still exists over the need for <br />development stan �' �£ =e draft standards include more detail than the City is <br />accustomed to seem w °z The City is accustomed to seeing standards for minimum setbacks <br />and maximum buildi g heights: but maximum setbacks and minimum building heights is <br />a switch. Though many cities have architectural standards regarding building materials, <br />we are not accustomed to this in Lino Lakes. Additional architectural standards are even <br />more disconcerting for some people here. <br />A public hearing will be held for the zoning amendment action, but it has not been <br />scheduled to date. Before the City does that, it is a good idea to revisit the Town Center <br />vision. Mary Divine, the City's Economic Development Assistant, has prepared a <br />presentation to demonstrate the need for the design standards. <br />Ms. Divine presented a slide show relating to traditional neighborhood developments and <br />• the need for design standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.