Laserfiche WebLink
Planning & Zoning Board <br />September 11, 2001 <br />Page 10 <br />10. A minimum 150 -foot setback shall be maintained along the site's northern boundary. The <br />buffer yard consisting of a berm with plantings shall extend 40 feet north into this 150 -foot <br />setback line (i.e., the berm shall be maintained in the southern part of the 150 -foot setback). <br />The berm shall be maintained at an eight foot height. This condition shall apply to both the <br />overall conditional use permit on the entire site for the concrete plant as well as the interim <br />use permit in the northern portion. <br />11. The City shall prohibit on -street truck parking along Lilac Street. Molin shall inform drivers <br />of this prohibition. This condition shall apply to the overall conditional use permit on the <br />entire site for the concrete plant. <br />12. All applicable MPCA requirements shall be satisfactorily met. This condition shall apply to <br />the overall conditional use permit on the entire site for the concrete plant. <br />13. The following noise mitigation efforts shall be utilized: <br />a. The outdoor storage yard on the northern portion shall <br />maneuvers toward residential properties are minimized. <br />use permit. <br />that truck backing <br />applies to the interim <br />b. Molin equipment and trucks shall be outfitted with lights to replace backup beepers <br />during nighttime hours (6:00 p.m. to 8:00 a. '. use use of strobes over beepers has <br />been approved by the Minnesota Dept. of L an• dustry, OSHA, this condition shall <br />apply to both the overall conditional us zee «on t� entire site for the concrete plant as <br />well as the interim use permit in the <br />If, in the future, there is some <br />shall be required to apply fo <br />permit. <br />w why the strobes are not sufficient, Molin <br />ndm `` t to the conditional use permit and interim use <br />14. A noise analysis s all be p rmed to test compliance with MPCA noise standards. <br />15. The new landscapi ted 8/1/01 and received by the City August 13, 2001 shall be the <br />approved plan. All tings shall be in place by June 2002. Plantings shall be maintained in <br />a healthy state. Dead lantings shall be replaced in a timely manner. This condition applies <br />to the overall conditional use permit on the entire site for the concrete plant as well as the <br />interim use permit for storage in the northern portion of the site. <br />16. The interim use permit on the northern portion, zoned LI, allows for storage, not production. <br />No production or finishing activities shall be conducted in this area. This includes cutting, <br />grinding, and other such work. <br />17. The interim use permit will expire if there is a change in the land use in the LI District on the <br />northern portion of the site. <br />18. The following conditions that were approved on October 27, 1997 shall no longer apply: <br />- condition 11 a. requiring storing wall panels parallel to the buffer yard (berm); <br />- condition 13 c. requiring a solid row of coniferous trees on the north side of the berm <br />and a row of deciduous trees on the south side of the berm; <br />