My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/14/1999 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1999
>
07/14/1999 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 11:33:49 AM
Creation date
7/15/2014 1:14:48 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
07/14/1999
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Planning & Zoning Board <br />July 14, 1999 <br />Page 5 <br />Acting Chair Lane stated she agrees the Legion is a good neighbor. She noted that she <br />lives down the street from the project. The Legion is not a 24 hour a day business. She <br />would rather see the Legion than a 24 hour a day gas station. She stated it is, however, <br />important to minimize the neighborhood impact. <br />Mr. Dunn suggested a condition regarding the tree bank be added. If all the trees cannot <br />be replaced on site they should be put in the City's tree bank. It has been suggested that <br />the tree bank become standard practice within the City. <br />Ms. Dunn noted she is against a condition regarding the tree bank. <br />Mr. Corson made a MOTION, to approve rezoning the entire four acres to general <br />Business based on the findings in the staff report, and was supported by Mr. Dunn. <br />Motion carried 6 -0. <br />Mr. Corson made a MOTION to approve the condition sg ased on the findings <br />in the staff report and with the following conditions: <br />1. Stormwater pond slopes shall be adjusted t <br />2. Drainage easements shall be dedicated <br />easements are to be recorded with An <br />3. Routing of sanitary sewer an <br />n on a revised site plan. The <br />applicant's cost. <br />hall be shown on a revised site plan. <br />4. Stormwater manageme t i' and grading plans shall obtain the approval of the <br />City Engineer and the ee atershed District prior to any site grading. <br />5. The common <br />driveway access t ve is subject to comment by the Anoka County Highway <br />Department. <br />shall be shown on the revised site plan. The location of the <br />6. Utility and parking construction plans must obtain approval from the City Engineer <br />prior to any site grading. <br />7. If possible, impervious surface shall be reduced by exploring green parking or other <br />measures. <br />8. Impervious surface shall not exceed the 75% of the site as required by the Zoning <br />Ordinance, and the new access drive shall be included in the calculations. <br />9. The applicant shall confer with the City Forester regarding a tree replacement plan and <br />minimizing the loss of existing trees on the site. Tree loss shall be replaced on a 1:1 <br />caliper inch basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.