My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/1998 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1998
>
04/08/1998 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 11:20:28 AM
Creation date
7/16/2014 8:44:39 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
04/08/1998
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Planning & Zoning Board <br />April 8, 1998 <br />Page 17 <br />purposes. The garage would be located just north of the existing building as shown on <br />the site plan within the setback requirements of the District. Ms. Wyland noted that the <br />Church proeprty is zoned R -1X Single Family Executive and churches are allowed by <br />conditional use permit. According to the Zoning Ordinance, the proposed garage would <br />be considered a permitted accessory use "incidental and customary to the uses <br />permitted..." and the moving in of a building would require this site plan review. The <br />subject property is indicated as Single Family Resiential on the current and proposed land <br />use map. <br />Ms. Wyland reported that she and the Building Official have inspected the garage to be <br />relocated and found it to be structurally sound and in good repair. The building is a 20 x <br />20 two -door garage with side windows and eight inch masonite siding. They intend to <br />paint the building to match the existing church. <br />Staff recommended approval with the following conditions: <br />1. Proper building permits are obtained and the structure is located according to <br />UBC Standards. <br />2. The building be painted to match the existing church structure. <br />3. The building be secured as recommended by the CPTED Officer. <br />4. The general drainage plan for the site be maintained and subject to the review of <br />the City Engineer. <br />Mr. Corson commented on the need to be sure the building did not have any asbestos <br />siding. <br />Mr. Schilling asked if it would need a structural inspection after the move and Ms. <br />Wyland said that they did need a building permit so their would be final inspections. <br />Mr. Johnson asked if they planned on putting electricity into the building and it was <br />stated that they would not. <br />Mr. Dunn made a MOTION to approve the site plan review, pursuant to the conditions <br />presented, and was supported by Mr. Robinson. Motion carried 7 -0. <br />H. PUBLIC HEARING, Zoning Ordinance Text Amendment <br />Chair Schaps declared the public hearing open at 8:48 p.m. <br />• Mr. Brixius reviewed the draft Zoning Ordinance amendment which establishes drive - <br />through facilities accessory to banks and financial institutions as "permitted" rather than <br />
The URL can be used to link to this page
Your browser does not support the video tag.