My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/11/1996 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1996
>
12/11/1996 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2014 2:47:35 PM
Creation date
7/16/2014 10:13:26 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
12/11/1996
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Planning & Zoning Board <br />December 11, 1996 <br />Page 8 <br />City was required to revisit its shoreland regulations for them to comply with state <br />requirements. In this process the DNR agreed to allow community zoning <br />flexibility separate from state regulations. The first phase complied with state <br />standards in density. The second phase complies with the rules the City <br />adopted and which were approved by the DNR. Streets and utilities are <br />available to these additional units. <br />Ms. Dahl asked if the developer has pictures or a model of the project. <br />Mr. Hokanson stated that the new units will be the same as those built in the first <br />phase and will be in the same price range of $85,000 to $100,000. <br />Mr. Johnson made a MOTION to close the public hearing at 7:17 p.m. and was <br />supported by Robinson. The motion carried unanimously. <br />Chair Schaps noted that the motion will include adoption of the same evaluation <br />criteria that was adopted in July 1995 for the first phase. <br />Mr. Robinson made a MOTION to approve the requested planned development <br />overlay (PDO), subject to the conditions and recommendations listed in the staff <br />report. He was supported by Johnson. Motion carried unanimously, 7 -0. <br />C. 96 -36 CUP, Otter Lake Animal Clinic, Wayne Scanlan, PUBLIC <br />HEARING, 6848 Otter Lake Road <br />Chair Schaps declared the public hearing open at 7:18 p.m. for the Otter Lake <br />Animal Clinic. <br />Ms. Wyland stated that Dr. Scanlan presented a project to construct an animal <br />clinic and boarding facility that was approved in July 1986. The building was <br />constructed as a pole barn with cedar wood treatment in front. He is requesting <br />to expand the facility by 50 percent which is allowed in the existing ordinance <br />under a Conditional Use Permit (CUP). The additional space will be used for <br />boarding and will change the capacity of the facility from 42 spaces to 100 <br />spaces. Outdoor kennels will also be expanded. Dr. Scanlan provides animal <br />control service for the cities of Circle Pines, Lexington and Lino Lakes, which is <br />the reason for this expansion. The property consists of 1.4 acres zoned light <br />industrial. Veterinary clinics are a permitted use with a CUP. The roadway and <br />entrance will be realigned, and staff is recommending that parking be reviewed <br />by the City Engineer once the realignment is completed. Staff is recommending <br />approval of the site plan and CUP, subject to the following conditions: <br />1. Proper building permits be received prior to any construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.