My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/14/1990 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
1990
>
03/14/1990 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2014 12:40:31 PM
Creation date
7/17/2014 11:24:32 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
03/14/1990
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />DESIGN REVIEW BOARD MEETING <br />March 14, 1990 <br />State statues allows for council reconsideration after a <br />year. <br />Mr. Chapman created a new sketch adding approximately 20 <br />mobile homes in a 7.2 acre parcel of land to expand Baldwin <br />Lake Court. The parcel is 1500 feet long. <br />Mr. Chapman stated that Baldwin Lake Mobile Home Court is <br />20.7 acres of land and is the only parcel zoned R -6 in the <br />entire city. <br />Mr. Chapman stated that trails can be added near the lake, <br />and open space can be provided. <br />Chapman spoke with Tom Hovie from the DNR and talked with the <br />Corp of Engineers and received a good response from both. <br />The Watershed District said that if he can satisfy the Corp <br />of Engineers than you probably can satisfy the RCWS District. <br />There is a lift station on Laurene Street. There will be a <br />need for a ditch in this area, and this will have to be <br />worked out with the city engineer. <br />During a work session held March 6th the design review board <br />looked at this sketch plan and came up with some ideas on how <br />to improve it. <br />The board discussed the following changes. <br />1. Adding additional frontage along highway 49. <br />2. Adding screening and buffering from the R -1 zone to <br />the north of Baldwin Lake Court. <br />3. Adding additional landscaping. <br />4. Connecting the new street with the existing long <br />cul -de -sac in order for two accesses to the court. <br />5. Resolving the problem with the lift station. <br />John Bergeson is also a member of the economic development <br />committee. He said that the EDC does not see a need for <br />further development of this kind, but Bergeson feels that <br />a R -1 zone does not lend itself well to this site. He feels <br />that it is best to rezone this property. <br />The long cul -de -sac was a concern by all the board members. <br />Also was the frontage from highway 49. <br />Darryl Schneider discussed the lift station at Laurene Ave. <br />He said that there is a two or three year capacity yet in <br />this lift station. Screening of the lift station is also a <br />concern to Mr. Schneider. The comprehensive plan will be <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.