My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/07/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
05/07/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:57:00 PM
Creation date
7/23/2014 9:50:49 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/07/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />May 3, 2001 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: April Maintenance Update <br />Rain, rain go away come back, ah let's say in mid July! The extremely wet April, we've been <br />experiencing, has slowed our efforts to get our athletic fields(softball, baseball, soccer) in shape <br />for the upcoming spring/summer season. If things dry out we hope to have all fields ready by <br />Monday, April 30th. Maintenance activities during April have included: <br />Ballfield renovation and maintenance <br />• Leveling and dragging infields. <br />• Home plate, pitching rubber and base peg repair. <br />• Cleaned out base boxes. <br />• Ballfield safety inspections. <br />• Installed new field number signs. <br />Soccer field layout and maintenance <br />• Field inspection. <br />• Moved goals where needed. <br />• Attached nets. <br />• Field painting. <br />City Hall West Project <br />• Installed player's benches. <br />• Leveled and seeded outfield, out of play and spectator areas. <br />Sunrise #3 and #4 <br />• Little League rebuilt the pitchers mound on these two fields as well as general field <br />cleanup. Thanks Little League! <br />Sunrise Park entrance sign <br />• A new sign will soon dress up the entrance to Sunrise Park. A local girl scout has <br />taken on the task as part of her leadership project. Work completed thus far by city <br />staff has included: <br />1. Removal of storm damaged spruce tree just north of main entrance. <br />2. Installation of earthen berm where new sign will be located. <br />3. Removal of old sign and reshaping of berm. <br />
The URL can be used to link to this page
Your browser does not support the video tag.