My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/07/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
05/07/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:57:00 PM
Creation date
7/23/2014 9:50:49 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/07/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CORE FACILITY DEVELOPMENT <br />Component #1 - General Sitework (Grading, Roadways, Parking Lots, Main Trails, Utilities) <br />Total Cost <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />Site Removals and Grading <br />Asphalt paving and concrete curbing for roadways & parking lots <br />Site amenities - trash receptacles, benches, bike racks, etc. <br />Asphalt trails <br />Site Utilities (budget cost for storm sewer) <br />Boardwalk <br />Seed / Sod <br />Wetland Mitigation (budget cost) <br />Landscape Improvements - trees, shrubs (minimal) <br />485,000.00 <br />500,400.00 <br />15,000.00 <br />40,500.00 <br />45,000.00 <br />14,000.00 <br />23,000.00 <br />50,000.00 <br />6,000.00 <br />Component #2 - Soccer Fields (5 fields total) <br />Component #1 • Total 1,178,900.00 <br />Total Cost <br />2 <br />3 <br />4 <br />Soccer goals and corner markers 22,000.00 <br />Irrigation 95,000.00 <br />Drinking Fountain 8,500.00 <br />Seeding 33,500.00 <br />Component #2 - Total 159,000.00 <br />Component #3 - Baseball Field <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />Total Cost <br />Drinking fountain 8,500.00 <br />Aggregate limestone infields and warning tracks, etc. 25,000.00 <br />Seed / Sod 16,000.00 <br />Site amenities - trash receptacles, park benches, bike racks 7,000.00 <br />Asphalt trail connections and internal pavement 9,600.00 <br />Irrigation system 20,000.00 <br />Concrete paving for bleacher & bench pads, etc. 8,550.00 <br />4" thick x 16" wide concrete maint. strip below ballfield fencing 6,500.00 <br />Chainlink fence backstop 12,000.00 <br />Chainlink ballfield fencing - with gates, etc. 39,000.00 <br />Ball and bat racks 1,600.00 <br />Bleachers 18,000.00 <br />Lino Lakes Community Athletic Complex Brauer & Associates, Ltd. <br />Schematic Design Cost Estimate <br />Page 2 of 6 0008 - lino - schem- cost- est- 02- 28- 00.wpd <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.