Laserfiche WebLink
• <br />CORE FACILITY DEVELOPMENT <br />Component #1 - General Sitework (Grading, Roadways, Parking Lots, Main Trails, Utilities) <br />Total Cost <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />Site Removals and Grading <br />Asphalt paving and concrete curbing for roadways & parking lots <br />Site amenities - trash receptacles, benches, bike racks, etc. <br />Asphalt trails <br />Site Utilities (budget cost for storm sewer) <br />Boardwalk <br />Seed / Sod <br />Wetland Mitigation (budget cost) <br />Landscape Improvements - trees, shrubs (minimal) <br />485,000.00 <br />500,400.00 <br />15,000.00 <br />40,500.00 <br />45,000.00 <br />14,000.00 <br />23,000.00 <br />50,000.00 <br />6,000.00 <br />Component #2 - Soccer Fields (5 fields total) <br />Component #1 • Total 1,178,900.00 <br />Total Cost <br />2 <br />3 <br />4 <br />Soccer goals and corner markers 22,000.00 <br />Irrigation 95,000.00 <br />Drinking Fountain 8,500.00 <br />Seeding 33,500.00 <br />Component #2 - Total 159,000.00 <br />Component #3 - Baseball Field <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />Total Cost <br />Drinking fountain 8,500.00 <br />Aggregate limestone infields and warning tracks, etc. 25,000.00 <br />Seed / Sod 16,000.00 <br />Site amenities - trash receptacles, park benches, bike racks 7,000.00 <br />Asphalt trail connections and internal pavement 9,600.00 <br />Irrigation system 20,000.00 <br />Concrete paving for bleacher & bench pads, etc. 8,550.00 <br />4" thick x 16" wide concrete maint. strip below ballfield fencing 6,500.00 <br />Chainlink fence backstop 12,000.00 <br />Chainlink ballfield fencing - with gates, etc. 39,000.00 <br />Ball and bat racks 1,600.00 <br />Bleachers 18,000.00 <br />Lino Lakes Community Athletic Complex Brauer & Associates, Ltd. <br />Schematic Design Cost Estimate <br />Page 2 of 6 0008 - lino - schem- cost- est- 02- 28- 00.wpd <br />A <br />