My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/07/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
05/07/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:57:00 PM
Creation date
7/23/2014 9:50:49 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
05/07/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />13 <br />14 <br />15 <br />Players benches 2,000.00 <br />2 Batting cages 25,000.00 <br />Landscape Improvements - trees, shrubs 10,000.00 <br />Component #4- 300' Combination Ballfields (4 fields total) <br />Component #3 - Total 208,750.00 <br />Total Cost <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />Furnish and install drinking fountain 8,500.00 <br />Aggregate limestone infields and warning tracks, etc. 95,000.00 <br />Seed / Sod 30,000.00 <br />Site amenities - trash receptacles, benches, bike racks 18,000.00 <br />Asphalt trail connections and internal pavement 45,600.00 <br />Irrigation system 72,000.00 <br />Concrete paving for bleacher & bench pads, etc. 34,550.00 <br />4" thick x 16" wide concrete maint. strip below ballfield fencing 22,000.00 <br />Chainlink fence backstops (with net assembly) 36,000.00 <br />Chainlink ballfield fencing - with gates, etc. 139,500.00 <br />Ball and bat racks 6,400.00 <br />Bleachers 72,000.00 <br />Players benches 8,000.00 <br />2 Batting cages 25,000.00 <br />Landscape Improvements - trees, shrubs 10,000.00 <br />Component #5 - 275' - 250' Youth Ballfields (3 fields total) <br />Component #4 - Total 622,550.00 <br />Total Cost <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />Furnish and install drinking fountain 8,500.00 <br />Aggregate limestone infields and warning tracks, etc. 58,600.00 <br />Seed / Sod 23,000.00 <br />Site amenities - trash receptacles, benches, bike racks 13,500.00 <br />Asphalt trail connections and internal pavement 37,900.00 <br />Irrigation system 50,400.00 <br />Concrete paving for bleacher & bench pads, etc. 25,900.00 <br />4" thick x 16" wide concrete maint. strip below ballfield fencing 13,250.00 <br />Chainlink fence backstops (with net assembly) 27,000.00 <br />Chainlink ballfield fencing -with gates, etc. 91,500.00 <br />Ball and bat racks 4,800.00 <br />Lino Lakes Community Athletic Complex Brauer & Associates, Ltd. <br />Schematic Design Cost Estimate Page 3 of 6 0008- lino - schem- cost- est- 02- 28- 00.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.