My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/30/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
07/30/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:51:21 PM
Creation date
7/23/2014 10:35:01 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
07/30/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />/0, <br />July 23, 2001 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: July Maintenance Update <br />Well, our extremely wet spring has given way to an extremely hot, dry July. As a result our non- <br />irrigated park areas are brown and dormant while our irrigated areas are working overtime to try <br />to keep the grass green. Thankfully, as I write this, Mother Nature is providing us with a pretty <br />good morning rainfall. Hopefully, there will be more in the future. <br />Maintenance activities during July have included: <br />♦ Mowing of parks and athletic fields. With the lack of rainfall our mowing frequency has <br />decreased. <br />♦ Daily ballfield preparation <br />Spring softball and baseball seasons are winding down meaning fewer fields need daily <br />preparation. This has allowed us more time to concentrate on other projects. <br />♦ Weekly Garbage Pickup <br />Most of our parks are having garbage collected once a week. However, some of our high use <br />areas are being collected twice weekly. <br />♦ Irrigation System Maintenance and Repair <br />Most of the work has entailed cleaning or replacing heads and resetting heads to proper <br />grade. (Heads set to high or low constitute a safety hazard and we are trying to address this.) <br />♦ Irrigation System Installed at Marshan Park (Contracted) <br />With the irrigation system in place we are planning to seed in mid - August. <br />♦ Summer Fertilizer Application <br />Applied second fertilizer application to approximately 40 acres of irrigated sports fields and <br />park areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.