My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/01/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
10/01/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:48:42 PM
Creation date
7/23/2014 11:01:18 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/01/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Rice Lake Elementary Field #2 <br />Improvements to the players bench area have been completed including concrete pads <br />and aluminum player's benches with backs. <br />• Marshan Park Seeding <br />The south half of Marshan Park is now green and appears to be filling in nicely. Work <br />performed on this project has included the following: <br />• Two chemical applications (Roundup) to kill existing vegetation. <br />• Tilling of entire south half of park. <br />• Installed drain tile in trouble spots. <br />• Final seed bed preparation (dragging and leveling). <br />• Brillion seeded south half, slit seeded north half with Athletic Pro II seed mix (750 <br />lbs. total). <br />• Hand seeded native prairie area between trail and townhomes to the east. <br />• Applied two applications of 13 -13 -13 since germination. <br />• Programmed and adjusted irrigation system as needed. <br />As you can see a lot of work goes into the seeding of a new park area. We anticipate cutting the <br />south half for the first time later this week. We also hope to spray for broadleaf weeds later this <br />fall, time and weather permitting. <br />• • City Hall Skate Park <br />Work for the project has included: <br />• Installation of 60'x80' bituminous pad (contracted). <br />• Assembly of skate park equipment. <br />• Installation of 80'x6' high privacy fence along west edge of pad. <br />• Site preparation and seeding of area around pad. <br />• Planting of 6 Norway Pine and 11 shade trees around skate park area. <br />• Hazard tree removal from Sunrise Park (contracted). <br />• Country Lakes Park <br />Removed old sign and prepped site for new sign and landscaping. <br />• Trails <br />Flail mowing and brush trimming of trail edges. <br />Those are the major highlights from the last two months. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.