My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/03/2001 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2001 Park Board Packets
>
12/03/2001 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:44:08 PM
Creation date
7/23/2014 11:28:06 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
12/03/2001
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />November 26, 2001 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: November Maintenance Update <br />Can you believe this November? The mild weather we've been experiencing has allowed us to <br />continue working on our sports fields much later than usual. <br />Athletic field projects have included: Top dressing, core aerifying and overseeding soccer and <br />football fields worn areas, infield renovation at Birch Park and working track renovation at <br />Sunrise Park Fields #1 and #2. <br />Other maintenance highlights for November have included: <br />• Winterizing and storing summer equipment. <br />• Equipment changeover (from mower to blower). <br />• Removed damaged equipment from Brandywood playground. <br />• Installed rink berms at Lino, Marshan and Birch Parks. <br />• Repaired broken park benches at Rice Lake Estates Park and along Clearwater Creek <br />trail. <br />• Closed City Hall skate park. Installed orange snow fencing around perimeter. <br />• Repaired and realigned gates on athletic fields at Centennial Middle School. <br />• Black Duck trail — performed shoulder work in potential washout areas. <br />• Picked up all picnic tables — stored under picnic shelters at Sunrise and Lino Parks. <br />• Maintained existing wood duck houses, installed 5 new houses. Of the 24 nest boxes <br />available this spring 14 were successfully used by wood ducks resulting in approximately <br />125 -175 ducklings jumping from our boxes this spring. <br />Those are November highlights more to come in December. <br />sw /parkboard/mike hoffman/November 01 Park Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.