My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/04/2002 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2002 Park Board Packets
>
01/04/2002 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2014 2:43:22 PM
Creation date
7/23/2014 11:37:56 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
01/04/2002
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Sunrise Park <br />• Ballfield Improvements — Rebuilt pitching mounds on Fields #3 and #4. <br />Widened base paths on Field #4. Renovated warning tracks on Fields #1 <br />and #2. <br />• Entrance Sign — Coordinated for Leadership Project. Removed old sign <br />and landscaping. Installed landscape block, planting bed, plant materials <br />and new entrance sign. <br />• Warming House and Garage — Coordinated for Leadership Project. <br />Painted building exterior and trim. Painted City logo on south side of <br />building. <br />Marshan Park <br />• Site prep and seeding of south '/2 of park, over - seeded north 1/2 <br />• Site prep and seeding of approximately 1/4 acre to native grasses and wild <br />flowers <br />• Irrigation System installed <br />Behm's Park <br />• Installed landscape block planting bed, plant materials and new park sign <br />(Leadership Project) <br />Country Lakes Park <br />• Installed landscape block planting bed, plant materials and new park sign <br />(Leadership Project) <br />Lino Park <br />• Painted interior and exterior of warming house <br />Rice Lake Elementary School <br />• Installed aluminum players benches and concrete pads at Field #2 <br />Centennial Middle School <br />• Widened base paths and on deck areas at Field #1 <br />Birch Park <br />• Renovated infield area <br />Miscellaneous <br />• Completed Black Duck Drive trail <br />• Installed park benches and concrete pads (1 at City Hall playground, 2 <br />along Clearwater Creek Trail) <br />• Planted over 150 trees at various park locations <br />• Purchased John Deere 4100 tractor and attachments <br />• Chipped Christmas trees and brush piles <br />• Paved trails in Highland Meadows development <br />
The URL can be used to link to this page
Your browser does not support the video tag.