Laserfiche WebLink
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />• <br />April 30, 2002 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Clearwater Creek Park Update <br />Development of Clearwater Creek Park has been hampered due to the wet conditions this spring. <br />However we are continuing to develop Clearwater Creek Park in several areas: <br />• The play equipment container area including general grading, play area sub -cut, drain tile <br />installation, and play area curbing has begun and will be completed by May 9. <br />• The landscaping for the entire park is scheduled to begin later this week. <br />• The gazebo installation is scheduled to be done between May 13 — May 24. <br />• The playground equipment will be installed on Saturday, May 18. Clearwater Creek area <br />residents along with Park Maintenance Staff and a certified playground installer will begin <br />installing the equipment at lam. The wood fiber will be delivered on May 23. <br />• The concrete flat work for sidewalks and the gazebo plaza area, fine grading, site restoration, <br />and final cleanup will be done between June 3 — June 14. <br />• A 2" service tap including curb stop and 1" blowout will be done to provide a future <br />connection for the irrigation system. <br />After the above items are completed, we hope to be able to pave the internal trails and prepare <br />the entire park area for seeding this fall. <br />sw /parkbrd/meeting information/Clearwater Creek Park Update 5- 6- 02.doc <br />