My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/04/2002 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2002 Park Board Packets
>
11/04/2002 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:11:40 PM
Creation date
7/23/2014 12:42:39 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/04/2002
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />October 31, 2002 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Project Updates <br />Clearwater Creek Park <br />In order to create better soils and to establish healthy turf, approximately 1500 cubic yards of <br />peat was delivered to the park area. The peat was spread throughout the park and chisel plowed. <br />As soon as the weather cooperates, a netavator will be used to till the peat and mix a couple <br />inches of subsurface clay with the imported peat. The park area will then be surveyed and final <br />graded. Depending upon the completion of the above work, the park area will either be dormant <br />seeded yet this fall or seeded next spring. The trails and basketball court will be paved this <br />spring. <br />The remaining landscaping was recently completed. The gazebo roof panels, beams, and rails <br />have been painted and installed. Electrical service will be run to the gazebo this spring. <br />Highland Meadows Park <br />The development of Highland Meadows Park has seen tremendous progress the past few months. <br />All onsite earthwork including stripping of the vegetative growth and grading work have been <br />completed. One thousand cubic yards of topsoil was imported, spread, and graded throughout <br />the entire park area. All asphalt work including the installation of trails and a half court <br />basketball court, as well as concrete work including the play area curbing, picnic table pads, and <br />park bench pads were also completed. <br />A limited amount of landscaping work may begin yet this fall. This may include seeding several <br />of the naturalized areas around the perimeter of the park with various types of seed mixtures <br />including mesic prairie, wet -mesic prairie, and savanna. An extensive landscaping plan <br />including trees and planting beds are also planned. An irrigation system will also be installed <br />this fall. <br />Playground equipment proposals will be on display at City Hall, 600 Town Center Parkway, in <br />the library on the following dates and times. <br />Monday, December 9 <br />Tuesday, December 10 <br />Wednesday, December 11 <br />Thursday, December 12 <br />12p.m. — 8p.m. <br />8a.m. — 8p.m. <br />8a.m. — 8p.m. <br />8a.m. — 8p.m. <br />Area residents are encouraged to review the playground equipment proposals and provide input. <br />The playground equipment will be installed Spring, 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.