My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/04/2002 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2002 Park Board Packets
>
11/04/2002 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:11:40 PM
Creation date
7/23/2014 12:42:39 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/04/2002
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• Seeded boulevard area at Lino Park. <br />• Sodded area adjacent to trail at 6459 Clearwater Creek Drive (contracted). <br />• Behm's Park — Sodded area adjacent to trail between Mustang Lane homes. Site prepared <br />and seeded at corner of Mustang and Palomino Lane. <br />• Tree removal at Highland Meadows Park (contracted). <br />• Began ordering plant material for spring planting 2003. <br />And of course, the ongoing work at Clearwater Creek Park. Work there has included hauling <br />and spreading of topsoil, (mainly peat 4" depth), completion of landscape plantings, and <br />installation of the gazebo frame (all contracted). <br />Remaining work includes: <br />• Ripping or chisel plowing site to help relieve compaction. <br />• Rototilling (netovator) entire site to incorporate peat into existing clay. <br />• Finish grading and seeding. <br />• Completion of gazebo. <br />• Those are the major highlights for August and September. More to come in November. <br />sw /parkbrd/Mike Hoffman/August- September 02 Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.