My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/03/2003 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
02/03/2003 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:06:11 PM
Creation date
7/24/2014 8:30:51 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/03/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />January 24, 2003 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: December 2002 and January 2003 Park Maintenance Update <br />Can you believe it? Late January and still no snow on the ground. The only time I've had the <br />plow on my truck was in early November and that was just to make sure everything worked <br />properly. <br />Maintenance activity during a very brown winter has included: <br />♦ Daily maintenance of all hockey and pleasure rinks. With the warm weather we had been <br />experiencing it was a challenge to keep skateable ice but, with the recent cold snap we have <br />been able to build a good base of ice and rinks are now in good shape. <br />♦ Buckthorn removal — Maintenance staff cleared an area approximately 3/4 of an acre in size of <br />all buckthorn 1" in diameter and larger. All stumps were chemically treated to prevent <br />resprouting and all brush was either woodchipped and removed or brush flailed on site with <br />our new brush flail. <br />• Marshan Park storage building — We are in the process of replacing the old musty carpet with <br />vinyl tile throughout the building. Project is approximately t/ complete, anticipated <br />completion date mid- February. <br />• Playground inspections — Inspected and repaired all playgrounds. Also added Fibar where <br />needed. <br />♦ Conducted employee performance reviews of all maintenance staff. <br />♦ Attended MN Green Expo — (conference and trade show). <br />♦ Equipment maintenance. <br />♦ Warminghouse maintenance. <br />♦ Shop and Park Building Organizing — Trying to maximize storage in a limited amount of <br />space by adding shelving units and storage racks. <br />Those are the major projects of December and January. More to come in February. <br />sw /parkbrd/mike hoffman/December 2001 and January 2002 Maintenance Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.