My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/05/2003 Park Board Other
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
05/05/2003 Park Board Other
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:02:00 PM
Creation date
7/24/2014 8:48:17 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Other
Meeting Date
05/05/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />April 30, 2003 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Park Supervisor <br />SUBJECT: April Maintenance Update <br />Maintenance activity during a very busy April has included: <br />♦ Inspected all ball fields and performed maintenance as needed to prepare for spring. <br />♦ Game prepped fields as needed. <br />♦ Removed hazard trees and trimmed branches along the Timberwolf Trail trail. <br />• Completed Marshan storage building — tiled floor and painted walls. <br />• Completed playground inspections. <br />♦ Swept and inspected all City trails. <br />• Delivered and picked up picnic tables and garbage cans at Wargo (Earth Day). <br />♦ Distributed picnic tables. <br />♦ Prepped Trappers Ct. planting boxes for spring planting (removed rock and added <br />topsoil). <br />♦ Soccer field layout. <br />• Attended playground safety seminar. <br />♦ Inventoried existing park trees (for spring replacements and new tree locations). <br />♦ Prepped nursery area for spring plant material. <br />• Plant material delivered. <br />♦ Installed Highland Meadows playground main structure and swings. Waiting for <br />weight restrictions to come off before wood fiber can be delivered. Smaller <br />structure and spring toys still need to be installed. <br />♦ Equipment maintenance and changeover. <br />As you can see, April has been quite busy and with a couple of major projects slated for May, it <br />will be a challenge to keep up with the ever increasing work load. <br />Bring on the seasonals! Please! <br />sw /parkbrd/Mike/April 2003 Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.