Laserfiche WebLink
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />Co 14. t,c, <br />May 29, 2003 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Parks and Trails Development Update <br />A. Highland Meadows Park <br />❑ Playground Area <br />Park Maintenance staff continues to work hard to get this park ready for use. On <br />Saturday, April 26, a group of neighborhood volunteers along with City staff installed <br />playground equipment with a certified playground installer. Park Maintenance staff <br />subsequently completed the smaller playground structure and spread the wood fiber <br />throughout the entire playground area. <br />❑ Water Irrigation <br />Water service was run into the park as well as the irrigation system completed. <br />❑ Landscaping <br />Hoffman and McNamara completed planting trees and the landscaping areas. <br />❑ '/ Court Basketball Court <br />The 'h court basketball court has been painted and the backboard installed. <br />❑ Trail Repair <br />Arcade Asphalt is scheduled to remove and replace the bad patches of the bituminous <br />trail later this week. <br />❑ Grading and Seeding <br />We anticipate round -up being applied to the park area followed by final grading and seed <br />bed prepped. Seeding of the entire park area will then follow. <br />B. Clearwater Creek Park <br />Wet conditions have again delayed our park development efforts this spring. T.A. Schifsky <br />and Sons are installing the base and bituminous for the basketball court, and prepping all of <br />the trail segments for bituminous. Concrete pads for park benches will be installed next <br />week. The irrigation system is scheduled for installation on Monday, June 2. Upon <br />completion of the irrigation system, the entire park area will be final graded, seed bed <br />prepped, and finally seeded. <br />