My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/02/2003 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
06/02/2003 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:01:48 PM
Creation date
7/24/2014 8:52:29 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
06/02/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />Co 14. t,c, <br />May 29, 2003 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Parks and Trails Development Update <br />A. Highland Meadows Park <br />❑ Playground Area <br />Park Maintenance staff continues to work hard to get this park ready for use. On <br />Saturday, April 26, a group of neighborhood volunteers along with City staff installed <br />playground equipment with a certified playground installer. Park Maintenance staff <br />subsequently completed the smaller playground structure and spread the wood fiber <br />throughout the entire playground area. <br />❑ Water Irrigation <br />Water service was run into the park as well as the irrigation system completed. <br />❑ Landscaping <br />Hoffman and McNamara completed planting trees and the landscaping areas. <br />❑ '/ Court Basketball Court <br />The 'h court basketball court has been painted and the backboard installed. <br />❑ Trail Repair <br />Arcade Asphalt is scheduled to remove and replace the bad patches of the bituminous <br />trail later this week. <br />❑ Grading and Seeding <br />We anticipate round -up being applied to the park area followed by final grading and seed <br />bed prepped. Seeding of the entire park area will then follow. <br />B. Clearwater Creek Park <br />Wet conditions have again delayed our park development efforts this spring. T.A. Schifsky <br />and Sons are installing the base and bituminous for the basketball court, and prepping all of <br />the trail segments for bituminous. Concrete pads for park benches will be installed next <br />week. The irrigation system is scheduled for installation on Monday, June 2. Upon <br />completion of the irrigation system, the entire park area will be final graded, seed bed <br />prepped, and finally seeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.