Laserfiche WebLink
• <br />Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino-lakes.mn.us <br />June 30, 2003 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: June Maintenance Update <br />Maintenance activity during June has included: <br />❑ Playground inspections — Minor repairs were made as needed. <br />❑ Flail mowing of all trails and some park areas. <br />❑ Fertilizer application to all athletic fields and irrigated turf. <br />• ❑ Irrigation system programming and maintenance. <br />❑ Storm cleanup from June 24th storm. A number of trees had to be removed or trimmed from <br />city roadsides trails and parks. <br />❑ Watered plant material as needed. <br />a Mulched all newly planted park trees. <br />❑ Trimmed and weeded shrub beds at old parks building (Marshan). <br />❑ Laid out additional soccer field at Sunset Oaks Park. <br />❑ Daily ballfield preparation — During June ballfields were game prepped 193 times, averaging <br />about 9 fields per working day. <br />❑ Soccer field maintenance — Weekly line mow -ins, check nets and goals. <br />❑ Cleanup and mulching of native grass bed in front of Town Center. <br />❑ Weekly garbage collection. <br />❑ Party Wagon delivery and pickup for 7 dates. <br />• ❑ Clearwater Creek Park — Much has happened at Clearwater Creek Park over the last month. <br />Final grading was completed, 6 ADA trail entrance ramps and 4 bench pads were poured, silt <br />fence was removed from park perimeter, and irrigation system installed. We have decided to <br />wait until early to mid - August to seed the park. We feel we will have much better success <br />(11 <br />