My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/07/2003 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2003 Park Board Packets
>
07/07/2003 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:00:59 PM
Creation date
7/24/2014 8:58:47 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
07/07/2003
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />www.ci.lino - lakes.mn.us <br />iv. b <br />July 2, 2003 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: 2003 Goals Update <br />Clearwater Creek Park <br />Final grading was completed, 6 ADA trail entrance ramps and 4 bench pads were poured, silt <br />fence was removed from park perimeter, and irrigation system installed. The basketball court is <br />scheduled to be completed by the end of July. Park benches should also be installed sometime <br />this month. The entire park area will be seed bed prepped and seeded in early to mid August. <br />Highland Meadows Park <br />Turf areas and native areas have been seeded and mulched. The irrigation system has been <br />installed. Unfortunately, we have encountered several problems with the seeding contractor. <br />Several irrigation heads were damaged and several sections of the trail were damaged during the <br />site preparation and seeding process. Staff is very disappointed with the work done by the trail <br />contractor last fall and the seeding contractor this spring. We will strive to make the best out of a <br />bad situation. <br />A torrential rain received last week caused extensive erosion on the sloped areas. In addition to <br />reseeding several of the prairie areas, we expect to regrade and reseed the seeded turf areas this <br />fall. The sodded areas and the replacement of trees and shrubs should be completed by July 4. <br />Pheasant Hills Northeast Trail <br />Staff is still waiting for a final determination on the plans for the new residential subdivision in <br />Centerville. I will keep you posted as information becomes available. <br />Birch Park — Open Air Shelter <br />This project is scheduled to commence this fall. <br />Behm's Park — Half Court Basketball <br />This project is scheduled to commence this fall. <br />Sunrise Park — Pave Parking Lots <br />Staff met with a representative from TKDA last month; a survey crew is scheduled to begin the <br />process of developing plans. This project should be completed this fall. <br />Pursue Full Court Basketball at Rice Lake Elementary <br />The attached letter was sent to the School District on June 12, 2003. To date, I have not received <br />any response from the School District. <br />sw /parkbrd/meeting info /2003 Goals Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.