My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/05/2000 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2000 Park Board Packets
>
06/05/2000 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 12:57:10 PM
Creation date
7/24/2014 9:48:40 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
06/05/2000
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Lino Lakes Public Services Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />PARKS AND TRAILS DEVELOPMENT UPDATE <br />May 30, 2000 <br />Behm's Park <br />• Final grade complete <br />♦ Irrigation system almost finished <br />• Trail loop sub -base installed, should be paved within next few weeks <br />♦ Native grasses and wildflower seed mix scheduled to be seeded by June 30 (southern <br />portion of park) <br />• 250 — 300 lbs of grass seed will be spread after irrigation system completed and trail loop <br />is paved. (Landscape Pro Mix — bluegrass /rye grass mix) <br />♦ An eagle scout will be installing the park sign with landscaping <br />Brandywood Park <br />♦ Playground area has been excavated, graded <br />♦ Installation scheduled with park maintenance personnel and neighborhood volunteers <br />Saturday, June 3 beginning at 9:00 am <br />♦ A lot of deadfall removed from natural areas <br />Sunrise Park <br />• A dozen bare root trees planted near parking lot <br />♦ 5 row bleachers and pads installed Fields #1 - #4 <br />♦ Electrical work done for scoreboards at Fields #1 and #2 <br />Trails <br />• Marshan Park Trail - Landscaping project completed. Included 15 autumn blaze maple <br />trees and 68 bushes and shrubs. Fabric and wood chips were also placed <br />• Rice Lake Estates Park - Native grasses and wildflower seed mix will be spread along the <br />southern portion of the trail leading to Baldwin Park <br />♦ Lilac Street, east of Appaloosa - Already graded and sub -base, should be paved by end <br />of June <br />♦ Wenzel Farms trail loop - Work has not begun yet, needs grading, sub -base, and paving. <br />Boardwalk will need to be installed after the paving has been completed <br />Miscellaneous <br />• Closing date for lots on Sandhill Drive scheduled for June 23 <br />• Bare root trees planted at Rice Lake Estates, Sunrise, Behm's, Shenandoah, Pheasant <br />Hills, Birch, Wenzel Farms, and Arena Acres <br />• Bleachers and pads installed at City Hall Park, Centennial Middle School, Rice Lake <br />Elementary <br />5/30/00 <br />RD /Park Board /June 2000 park projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.