My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/07/2000 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2000 Park Board Packets
>
02/07/2000 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 12:31:57 PM
Creation date
7/24/2014 11:29:48 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
02/07/2000
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB- <br />6655, <br />TKDA <br />• ENGINEERS • ARCHITECTS • PLANNERS <br />February 7, 2000 <br />TOLT2, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />Mr. John Powell, P.E. <br />City Engineer <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, Minnesota 55014 <br />Re: Wenzel Farms Pedestrian Bridge <br />Lino Lakes, Minnesota <br />TKDA Commission No. 11985 -001 <br />1500 PIPER JAFFRAY PLAZA <br />444 CEDAR STREET <br />SAINT PAUL. MINNESOTA 55101.2140 <br />PHONE:851/292.4400 FAX,651/292 -0083 <br />Dear Mr. Powell: <br />Enclosed are the proposals received for the referenced project and the following are our <br />• comments regarding their content. <br />Six proposals were received, three were quotes for fabrication and delivery of the bridge <br />superstructure, requiring the City to construct the substructures and install the bridge. Three <br />proposals included the fabrication delivery and construction of both the sub structure and <br />superstructures. The proposals received are as follows: <br />1) Continental Bridge — This proposal is for the fabrication and delivery of the composite <br />tubular steel truss (with timber deck) bridge superstructure only and delivery. The <br />proposed bridge length is 50 -feet, single span, with a width of 6 -feet, 8 -feet and 10 -feet <br />as requested in the request for proposals. The bridge costs proposed are $14,386 for the <br />6 -foot width, $16,389 for the 8 -foot width, and $ 17,629 for the 10 -foot width. This <br />proposal does not include materials for the bridge substructure. No warranty is <br />indicated for the materials in this proposal. <br />This proposal does not include material costs for the bridge substructure. <br />The City will be responsible for providing equipment to unload the bridge from the <br />delivery vehicle, design and construction of the bridge substructures, permitting with <br />the Rice Creek Watershed District, and erection of the bridge superstructure. <br />2) Wheeler Lumber LLC - This proposal is for the fabrication and delivery of the <br />composite tubular steel truss (with timber deck) bridge superstructure only and delivery. <br />The proposed bridge length is 37 -feet, single span, with a width of 6 -feet, 8 -feet and 10- <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.