Laserfiche WebLink
• <br />• <br />• <br />FEB -07 -2000 14:55 <br />Mr. John Powell, P.E. <br />February 7, 2000 <br />Page 3 <br />bJl eJe eeb� <br />5) York Bridge Concepts — This bridge proposal includes furnishing and installing a <br />pressure treated timber superstructure and substructure. The proposed bridge length is <br />37 -feet, single span, with a width of 6 -feet, 8 -feet and 10 -feet as requested in the request <br />for proposals. The bridge costs proposed are $20,240 for the 6 -foot width, $21,220 for <br />the 8 -foot width, and $22,184 for the 10-foot width. A 3 year warranty is indicated for <br />the materials in this proposal. <br />The City will be responsible for providing permitting with the Rice Creek Watershed <br />District, and erection of the bridge superstructure. <br />The proposal considers only 10 -foot long piles for the bridge substructures. We suspect <br />additional piling length will be required in order to properly found the bridge, at an <br />additional $25 per foot of piling installed. This could increase the cost of the <br />substructure $5,000 to $10,000. Additional costs may also be incurred for pile splices. <br />Engineer drawings, calculations or additional submittal items are at additional cost. <br />York Bridge Concepts states that they will work under the supervision of the owner. <br />We recommend the piling for the foundation of this bridge is creosote instead of CCA <br />as proposed. The creosote will provide assurances of longevity for the bridge <br />foundation under wet conditions. <br />6) Steadfast Bridges - This proposal is for the fabrication and delivery of the composite <br />tubular steel truss (with timber deck) bridge superstructure only and delivery. The <br />proposed bridge length is 37 -feet, single span, with a width of 6 -feet, 8 -feet and 10 -feet <br />as requested in the request for proposals. The bridge costs proposed are $12,592 for the <br />6 -foot width, $13,858 for the 8 -foot width, and $1 5,417 for the 10 -foot width. This <br />proposal does not include materials for the bridge substructure. A fifteen year warranty <br />is indicated for the materials in this proposal. <br />This proposal does not include material costs for the bridge substructure. <br />The City will be responsible for providing equipment to unload the bridge from the <br />delivery vehicle, design and construction of the bridge substructures, permitting with <br />the Rice Creek Watershed District, and erection of the bridge superstructure. <br />All of the bridge proposals, except the York Bridge, include self - weathering, steel truss <br />superstructure with timber decking. The York Bridge is a completely timber material bridge. <br />