My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/04/2000 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
2000 Park Board Packets
>
01/04/2000 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 12:23:29 PM
Creation date
7/24/2014 11:58:29 AM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
01/04/2000
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PUBLIC SERVICES DEPARTMENT <br />1999 Accomplishments <br />• <br />• <br />Parks Department <br />♦ Instituted Snow Trail Removal Policy <br />• Installed vandal resistant security lighting at Sunrise Park warming house <br />• Removal of dead or hazardous trees from city parks including Sunrise Park, Country Lakes Park, <br />South Reshanau Lakes Estates <br />• Removed, assembled, and replaced bleachers throughout parks system <br />♦ Painted interior of Sunrise Park and Birch Park shelters <br />♦ Developed new trail head sign <br />• Installed fencing near trails on Arrowhead Drive, Country Lakes Drive, and 12th Avenue <br />• Installed 11 wood duck houses at various locations, result of Eagle Scout project <br />♦ Trail restoration at Marshan Lane, Aqua Lane, Linda Lane including adding fill, grading, tilling, raking <br />and laying 825 yards of sod <br />♦ Removed Quail Ridge boardwalk <br />♦ Removed Shenandoah Park backstop <br />• Planted 40 shade trees at Sunrise, Birchwood Acres, Shenandoah, and Birch Parks <br />Civic Complex <br />♦ Established sub - grade, spread top soil, sod <br />♦ Transplanted and maintain trees <br />• Installed and maintain shrubs <br />♦ Maintained grounds of civic complex <br />Arena Acres Park <br />• Removed and replaced playground equipment <br />♦ Established playground area including grading, installation of borders and resilient surfacing <br />• Resurfaced tennis courts and basketball court <br />Behm's Century Farm Park <br />♦ Installed playground equipment <br />♦ Established playground area including grading, installation of borders and resilient surfacing <br />♦ Graded general skating rink <br />• Internal trails graded and sub -based <br />City Hall Park <br />City Hall Field #1 <br />• Replaced out of play and backstop fencing <br />• New player bench areas including pad, benches, and fencing <br />• Expanded infield ag -lime area <br />• Replaced base pegs, bases, home plate, and pitching rubber <br />City Hall Field #2 <br />• Replaced chain link fabric on lower portion of backstop <br />• Expanded infield ag -lime area <br />• Replaced base pegs, bases, home plate, and pitching rubber <br />Lino Park <br />♦ New parking lot <br />♦ Eagle Scout installed new landscaping around park sign <br />
The URL can be used to link to this page
Your browser does not support the video tag.