Laserfiche WebLink
• <br />• <br />• <br />Marshan Park <br />♦ Installed playground equipment <br />• Established playground area including grading, installation of borders and resilient surfacing <br />♦ Installed park benches and concrete pads <br />Pheasant Hills Park <br />♦ Completed % court basketball court <br />• Sealed deck and added wood chip mulch around base <br />Rice Lake Estates <br />♦ Completed playground area <br />♦ Completed % court basketball court <br />• Installed irrigation system <br />♦ Prepared site and seeded <br />• Installed park benches and concrete pads <br />• Trail connection to Baldwin Park installed <br />Sunrise Park <br />♦ Installed new roof on Shelter #2 <br />♦ Painted all shelters and picnic tables <br />Field #1 <br />• Infield to outfield lip removal <br />♦ Renovated infield and warning track <br />Field #2 <br />♦ Infield to outfield lip removal <br />♦ Renovated infield and warning track <br />Field #3 <br />• Replaced backstop and out of play fencing <br />• Installed new player bench areas including pad, fencing, and benches <br />♦ Renovated pitching mound area <br />♦ Sodded problem areas <br />• Expanded infield ag -lime area <br />• Replaced base pegs, bases, home plate, and pitching rubber <br />♦ Installed irrigation system <br />Field #4 <br />• Replaced backstop and out of play fencing <br />♦ Expanded infield ag -lime area <br />• Rebuilt pitching mound <br />♦ Installed new player bench areas including pad, fencing, and benches <br />• Completed irrigation system <br />• Renovated right field area including cut sod, established safer grade, re -laid sod <br />