My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/01/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
11/01/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 2:33:54 PM
Creation date
7/24/2014 12:17:16 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
11/01/1999
Park Bd Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Parks and Recreation Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />/D. <br />October 26, 1999 <br />TO: Park Board Members <br />FROM: Mike Hoffman, Parks Supervisor <br />SUBJECT: October Park Maintenance Highlights <br />October has flow by as it always seems to and with November, just around the corner, we know <br />the cold and snow will be upon us shortly. October has found us putting our parks to bed for the <br />winter as well as working on a number of park and trail improvement projects. <br />MAINTENANCE HIGHLIGHTS FOR OCTOBER <br />• Mowing and garbage pickup at all park locations. <br />• Trail Restoration <br />Three trail segments (Marshan, Aqua Lane, and Fox Trace) received restoration work along <br />the edge of the trail. Work consisted of adding fill, grading, tilling, raking, sodding, <br />watering, and rolling sod at each location. 825 yards of sod was laid to complete all three <br />areas. <br />• Lino Park <br />Park sign landscaping — see Eagle Scout project summary for details. <br />Parking lot — a new bituminous parking lot has been installed as part of the Lake Drive <br />improvements. Maintenance staff removed the fence separating the playground from the <br />parking lot so the blacktop could be run up to the concrete walkway. The fencing has been <br />re- installed. New sod has been laid around the park sign as well as the boulevard between <br />the parking lot and Lake Drive. <br />• Ballfield Improvements <br />Sunrise Fields #1 and #2 — Lip reduction where infield ag -lime meets outfield turf and where <br />warning track meets outfield turf. Over time a prominent lip forms as the ag -lime mat is <br />either washed by rain or blown by wind into the adjacent turf. Maintenance staff has <br />corrected this problem by sod cutting out the affected area, altering grade and soil <br />composition where necessary, and re- laying existing sod to establish a new level transition <br />line in these areas. <br />• Maintenance staff has made additional cutouts for the upcoming Turkey Shoot. <br />• Trail inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.