My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/04/1999 Park Board Packet
LinoLakes
>
Advisory Boards & Commissions
>
Park Board
>
Park Board Meeting Packets
>
1999-2020 Park Board Packets
>
1999 Park Board Packets
>
10/04/1999 Park Board Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 3:35:14 PM
Creation date
7/24/2014 1:31:15 PM
Metadata
Fields
Template:
Park Board
Park Bd Document Type
Park Board Packet
Meeting Date
10/04/1999
Park Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes Public Services Department <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />(651) 982 -2440 Fax (651) 982 -2439 <br />g8. <br />September 27, 1999 <br />TO: Park Board Members <br />FROM: Rick DeGardner, Public Services Director <br />SUBJECT: Behm's Century Farm Park Development Update <br />At the July 12 City Council meeting, the Council approved selling 2.55 acres of city property in <br />Behm's Century Farm Park. The proceeds are to be used for development of the remaining park <br />land (6 acres). <br />Mr. Uhde has agreed to provide the following scope of work: <br />• Clearing and grubbing all areas for bike paths and active play areas and removing storm <br />damaged trees and groundfall. <br />• Install all necessary silt fence and erosion control. <br />• Perform park grading including grading for trails, play area, and drainage. <br />• Tillage of existing soils in all open areas to prepare for seeding. <br />• Installation of trails including 4" sub -base. <br />The estimated project costs of the above listed items is approximately $52,000. Mr. Uhde has <br />agreed to provide a summary of development costs. If total development costs are less than <br />$75,000, Mr. Uhde will submit a cashiers check for the difference. I anticipate using the <br />additional amount for irrigation, seeding, and paving trails. <br />Attached is a grading plan for the park area. Please note the eastern trail is located within a 50' <br />wide strip of park land leading to Mustang Lane. An additional trail connection is also located in <br />the northeastern portion of the park which lines up with the trail connection to the 5th Addition. <br />Note the area inside the trail loop will be leveled and prepared for seeding. Areas outside the <br />trail loop will be kept in its natural state. I anticipate keeping the southeastern portion of the <br />park more of a natural area which may include prairie grass, etc. <br />The Rice Creek Watershed District approved the project including realigning the drainage ditch <br />on September 22. I anticipate grading activity to begin very soon. <br />Playground installation is scheduled for Saturday, October 23, at 9am. Flanagan Sales (Little <br />Tikes) was selected as the vendor. We have about a dozen residents who have expressed an <br />interest in assisting the city in installing the playground equipment. <br />RD:sw <br />sw /parkbrd/Behm's Century Farm Park Development Update.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.