Laserfiche WebLink
• <br />Preservation Development Packet <br />v' Process Summary <br />Summarizes steps in the process and who will be involved in each step. <br />"Beyond Clustering" article by Randall Arendt, Civil Engineering News, January 1998 <br />Explains the model process. Specific elements will vary with each project. Potential impacts on <br />the environment will be examined regarding drainage and other aspects. <br />Stormwater Infiltration Overview, Rice Creek Watershed District Fact Sheet, <br />Gives general philosophy. Specific requirements must be discussed with the City Engineer. <br />Guidelines for Subdivision Conservation Easements, Minnesota Land Trust <br />Conservation easements may not be appropriate• on every project. If conservation easements are <br />appropriate to a project, we should keep these guidelines in mind when designing the open space <br />to be protected. <br />Preservation development will be a planned development overlay to allow the flexibility needed to <br />design to the natural features of the site. <br />• A planned development overlay is a rezoning in Lino Lakes. <br />