Laserfiche WebLink
12/20/2000 06:24 6124018798 <br />FROM : NORTH AMERICAN PROlRIES CO <br />KJOLHAUG ENVIR SERV PAGE 04 <br />PHONE NO. : 320 274 5316 Dec. 19 2000 12:55PM P3 <br />• <br />success of the project. Because of the size and condition of this project a <br />longer time line should have been drawn into the original plans. The initial <br />time line to install the project was one season. This was in retrospect, <br />pushing the limits of what could be effectively done with a site of this <br />magnitude, considering the size of the project area and the massive <br />infestation of hearty exotic and invasive species. <br />In the spring of 2001 the first task to be performed will be a prescribed burn. <br />After .a period of time has elapsed sufficient to allow re- growth from seed or <br />residual roots systems, a final herbicide treatment will be applied. Anytime <br />after the final herbicide treatment all native plant materials will be installed <br />using the most effective method given the precise landscape involved <br />(drilling send with Truax drill whereever accessible, broadcasting seed when <br />less accessible). After the initial installation we will monitor the site for. <br />further management issues. <br />1 hope the elongated timeline we are now dealing with has not created an <br />inconvenience or caused any problems with any of the parties involved, <br />including, Gorem, The city of Lino Lakes or Kjolhaug Environmental I <br />assure you, although this project may be running longer than originally <br />thought, it will be completed and completed successfully. If any members <br />of the parties noted above need more clarification about this letter, l would <br />be well disposed to answer any questions ask to me regarding any aspect of <br />this project. <br />Sincerely__ <br />Tony Rieger -Borer <br />President <br />