Laserfiche WebLink
estimated by City of Lino Lakes to be 886.00 MSL with an ordinary high water elevation <br />of 885.5 to 884.0 MSL. <br />15. Water Surface Use: Will the project change the number or type of water craft on <br />any water body? If yes, indicate the current and projected watercraft usage and <br />discuss any potential overcrowding or conflicts with other users or fish and wildlife <br />resources. <br />Not Applicable. <br />16. Soils: <br />Approximate depth (in feet) to: <br />minimum average <br />Ground Water 2 feet 15 -20 feet <br />Bedrock N/A N/A <br />Describe the soils on the site, giving the SCS classifications, if known. (SCS <br />interpretations and soil boring logs need not be attached.) <br />Soils on site include primarily 4 -5 layers of silty sand (SM) and sand with silt (SP -SM). <br />Geotechnical exploration was conducted by American Engineering and Testing. <br />Report to be attach. See Appendix <br />17. Erosion and Sedimentation: <br />Give the acreage to be graded or excavated and the cubic yards of soil to be moved: <br />PTG has Emailed Larry Rogers at Ryan to verify earthwork quantities. <br />acres: 41.82 <br />cubic yards: 170,000 <br />Describe any steep slopes or highly erodible soils and identify them on the site map. <br />Describe the erosion and sedimentation measures to be used during and after <br />construction of the project. <br />There are no steep slopes on this site. <br />Because the project will involve disturbance of more than five acres of land, application <br />for coverage under the NPDES General Permit for Construction Activities will be <br />submitted to the Minnesota Pollution Control Agency and prior to initiating earthwork on <br />the site. The permit requires that best management practices (BMPs) be used to control <br />erosion and that all erosion controls be inspected after each rainfall exceeding 0.1 inch of <br />precipitation. Erosion control practices to be used on the site will include: <br />PARSONS <br />TRANSPORTATION GROUP <br />Berton•Aschman • De Leuw, Lather, • Steinman <br />Page 10 <br />Town Center Development <br />Draft -Draft EAW....February 1, 2001 <br />