My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/25/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
04/25/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2014 3:52:25 PM
Creation date
7/30/2014 11:46:13 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/25/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CYAN <br />SUBDIVISION <br />APPLICANT is requesting preliminary plat approval. The preliminary plat addresses lot <br />subdivision, right of way dedication, utility and drainage easements, and outlots. <br />In accordance with City Zoning and Subdivision Regulations (Platting), APPLICANT intends to <br />provide cash inlue of of land contributions to meet parkland dedication requirements. The <br />proposed development is 306,400 square feet. The park fee is set at $200 per 1,000 square <br />feet of structure or for the Lino Laked Marketplace project the APPLICANT will pay $61,280.00. <br />APPLICANT will prepare all cross easements, ingress /egress easements and site maintenance <br />agreements for all properties. <br />EASEMENTS <br />The following easements will be dedicated. <br />a. Standard drainage and utility <br />b. Cross access <br />c. Ingress /Egress <br />d. Right of Way <br />REQUEST APPROVAL SUBJECT <br />TO THE FOLLOWING STIPULATIONS <br />1. Building materials and colors for all buildings to be submitted for staff review <br />before the issuance of a building permit. <br />2. APPLICANT maintains the water quality ponds. <br />3. APPLICANT obtains Rice Creek Watershed District approval prior to the issuance <br />of a grading permit <br />4. APPLICANT submits final drainage calculations to verify storm water runoff and <br />catch basin numbers and locations prior to issuance of a grading permit <br />5. APPLICANT obtains appropriate demolition permits for building removal. <br />6. APPLICANT dedicates the following easements: <br />a. standard drainage and utility <br />b. ingress and egress <br />c. cross easements <br />d. right of way dedications <br />7. APPLICANT submits a grading bond before the issuance of a grading permit and <br />landscape bond before the issuance of a building permit. <br />8. APPLICANT submits a site regulatory sign package for staff review and approval <br />before the issuance of a building permit. <br />9. APPLICANT to petition for vacation of any obsolete utility easements <br />PARSONS <br />TRANSPORTATION GROUP <br />Barton- Aecbmen • De Lwow, Mier, • Steinman <br />Town Center Narrative <br />Page - 17 - <br />04/ 09/ 01 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.