My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/26/2002 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2002
>
06/26/2002 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 1:55:19 PM
Creation date
7/31/2014 1:56:10 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
06/26/2002
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENI'�A ITEM 51" <br />STAFF ORIGINATOR: Michael Grochala <br />P & Z MEETING DATE: April 10, 2002 <br />TOPIC: Public Hearing <br />• Comprehensive Plan Amendment: <br />MUSA Allocation <br />• Rezoning from R, Rural to R -1X, Single <br />Family Executive <br />• Preliminary Plat (Stoneybrook) <br />BACKGROUND <br />Tollefson Development, Inc., has submitted an-application for preliminary plat approval <br />of Stoneybrook, a 102 lot single family residential subdivision. The request also requires <br />approval of a Comprehensive Plan Amendment to allocate MUSA to the site and a <br />Rezoning from R, Rural District to R -1X, Single Family Executive Residential District. <br />The site is located adjacent to and south of Birch Street and a quarter mile west of <br />Centerville Road. <br />This review is based on the following submittals prepared by Pioneer Engineering, dated <br />March 6, 2002 and received by the City on March 11, 2002: <br />Preliminary Plat <br />Existing Conditions Plan <br />Preliminary Site and Utility Plan <br />Preliminary Grading and Erosion. Control Plan <br />.Detail Sheet . <br />And <br />Preliminary Landscaping Plan prepared by Pioneer Engineering, dated March 7, 2002, <br />and received by the City on March 11, 2002. <br />Wetland Delineation Report prepared by Barr Engineering, dated August 16, 2001, and <br />received by the City on March 27, 2002. <br />Geotechnical Report prepared by American Engineering Testing, Inc., dated February 28, <br />2002, and received by the City on March 27, 2002 <br />Wetland Replacement Plan prepared by Barr Engineering, dated March 2002, and <br />received by the City on March 27, 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.