My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/26/2003 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2003
>
02/26/2003 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 10:42:48 AM
Creation date
8/1/2014 11:46:06 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/26/2003
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
protection and management of the wildlife, habitats, and other natural <br />resources, and to pass on to future residents a community rich in these <br />lair— es re sd op to is f � c equa consideration o� <br />ecort, o <br />Section 5 - Administration <br />• Adopt a conservation development approach to planning as the working model for community <br />development. Example was established with the construction of the Civic Complex. <br />_Ilinvironmental Board Update 21- lc/February 28, 2001 <br />II have attached the Draft EAW and photos depicting some of the issues. 1 have also included some of my =tall <br />reaction to the draft EAW. There is no further information at this time. Brian Wessel will be present to update <br />you on anything new.' <br />DATE <br />CITY OF LINO LAKES <br />MINUTES <br />: January 3, 2001 (December meeting) <br />A. Dellwood LLC/ N.E. Quadrant of 35W and Lake Drive Update — Wessel explained that Mr. Payton had presented this <br />project at the last meeting. Since then, the Planning and Zoning Board and City Council have discussed it. A <br />neighborhood meeting has been held. The project is going through the informal discussion process prior to a formal <br />application. He then introduced Mr. Payton and Mr. Palmquist the Vice President of Research and Development of Ryan <br />Companies who was working on the SuperTarget concept. <br />Mr. Palmquist explained that recently, there had been a neighborhood meeting where the primary challenge to the project <br />was addressing the traffic needs. TKDA and Mr. Powell were dealing with the issue. The Environmental Board was <br />assured that the traffic could be managed with lanes and signals. Also discussed, was adequate buffering on the northern <br />part of the property. He noted an EAW would be done which would be finished in the first part of July. <br />Mr. Payton presented several maps and explained that the fmal topographic survey has been completed so more of the <br />spatial relationships have come together. He indicated that there was a small group of tamarack trees, which could be <br />protected by a retaining wall in the west. Asleson explained that the area has been disturbed more than once. He noted a <br />1953 topographic map that showed tamaracks throughout the area. The freeway went through in the 1960's and greatly <br />impacted the tamaracks: <br />Donlin inquired what plans Target had to address the tamarack trees in the area. Mr. Payton answered that the standing <br />water is only intermittent for 48 hours in a 100 -year event. He noted that there is an aquatic bench planned, with canary <br />grass plantings to reduce the presence of geese. He continued, they were waiting for the results of the soil reports to <br />17ap,ccr &_e%pearzov _BoapL Xzrz_oO_.Azvo_lazcea <br />
The URL can be used to link to this page
Your browser does not support the video tag.