My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/29/2003 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2003
>
10/29/2003 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 1:12:06 PM
Creation date
8/4/2014 11:14:37 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
10/29/2003
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ul. l - GU"-GYJYJJ <br />K l Lt LKttK WH I tKbrItU <br />Permit Application Nnr -073 Eagle Brook Church <br />651 766 4196 P.05/07 <br />3, 2003, received June 5, 2003. <br />Hydrologic Calculations prepared by SRF Consulting Group, inc., <br />dated June 4, 2003, received June 5, 2003. <br />Response' to- .Draft Engineers Report prepared. by SRF Consulting <br />Group, Inc., dated June 16, 2003, received June 17, 2003. <br />9. 1922 Anoka County Ditch 72 Plans, received June 17, 2003. <br />10. Pipe Capacity Calculations prepared by SRF Consulting Group, Inc., <br />dated June 16, 2003, received June 17, 2003. <br />11. Petition for Partial Abandonment and Reestablishment of County <br />Ditch 72, prepared by SRF Consulting Group, Inc., dated August 11, <br />2003, received August 13, 2003. <br />12. Copy of 1922 Anoka County Ditch 72 Plan and Profile. <br />13. Copy of Anoka County Ditch 72 Statement of Auditor Showing <br />Assessments Made on Lands dated March 29, 1923. <br />14. Engineer's Memo regarding partial ditch abandonment prepared by <br />FOR Inc., dated September 19, 2003. <br />15. P8 model and supporting documentation prepared by SRF <br />Consulting Group, Inc., dated September 30, 2003, received October <br />1, 2003. <br />16. Tile Line Capacity Calculations prepared by SRF Consulting Group, <br />Inc., dated September 30, 2003, received October 1, 2003. <br />Findings: 1 This project entails construction of a 54,000± SF church to be known <br />as Eagle Brook Church on 91± acres. The project also entails a <br />partial abandonment and reestablishment of the mainline of Anoka <br />County Ditch 72 and reconstruction of Branch 1 within the project's <br />parcel boundary. <br />The proposed stormwater management plan includes two NURP <br />ponds and 14 bioretention/infiltration features. These features meet <br />District water quality treatment, rate control, and infiltration <br />requirements. The submitted hydrologic calculations and grading <br />plan demonstrate that there will be no increase in runoff rates from <br />the site onto adjacent properties. <br />The main line of Anoka County Ditch 72 (ACD 72) and Branch 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.