My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/27/2005 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2005
>
04/27/2005 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 11:47:09 AM
Creation date
8/5/2014 9:46:39 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/27/2005
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Unique Features <br />The Tamarack bog to the East, although impacted is worthy of being called unique, and <br />the real possibility of restoring this bog is attainable. The Lino Lakes Blandings Turtle <br />Modal shows a possible breeding site and activity site to the East, but nothing on the <br />site. <br />There is a Bald Eagle nesting site to the East as well. If the nest is active during <br />construction, recommendations of a 1/4 mile buffer are desirable, and 1/2 mile if the <br />topography makes the construction visible from the nest. The nest is at t % is <br />e t IeaS� i Ile <br />away from the proposed construction. Most critical times for buffer concerns are from <br />March 15 — May 15 North of Highway 210, and Feb 10 — May 1 South of Highway 210. <br />There are no rare plant community indicators on this site. The site was evaluated during <br />the EAW process for rare plants, and none were found. <br />Lighting <br />There is no submitted lighting plan at this time. <br />OPTIONS: <br />1. Recommend approval with staff and Environmental Board recommendations. <br />2. Refer back to staff for further review <br />RECOMMENDATION: <br />Option 1 <br />Attachments: <br />1. C0.1 /Map key <br />2. C1.1 /Existing Conditions and Demolition Plan <br />3. C2.1 /Preliminary Site Plan <br />4. C3.1 /Preliminary Grading Plan <br />5. C3.2 /Grading and Erosion Control Details <br />6. C4.1 /Preliminary Utility Plan <br />7. C5.1 /Preliminary Plat <br />8. L2.1 /Preliminary Landscape Plan <br />9. L2.2 /Plant Schedule <br />10. Lino Lakes MLCCS <br />
The URL can be used to link to this page
Your browser does not support the video tag.