My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/26/2005 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2005
>
10/26/2005 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 11:11:58 AM
Creation date
8/5/2014 11:51:47 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
10/26/2005
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />that action will take place after silt fences are 1/2 full. This should be changed to <br />1/3 full and repaired within 24 hours of documentation. It should be noted that <br />additional rock will be stockpiled or brought in should the rock entrance become <br />non - functional due to rock space filling. All Storm sewer catch basins installed <br />on the site must be protected from sediment deposition with an approved City <br />device such as the Royal Infrasafe Collection Device. <br />Best Management Practices <br />A BMP plan was also submitted from Target (Attachment 10). JADT should <br />duplicate this or work jointly with Target/Kohl's. A written plan on how this will be <br />accomplished must be submitted to the City for approval. <br />Options: <br />1. Approve recommendations and comments <br />2. Other recommendations as per the Environmental Board <br />Recommendation: <br />Option three <br />Attachments: <br />1 Preliminary Plat of JADT Second Addition <br />2. Boundary and Topography Survey <br />3. Grading, Drainage and Erosion Control Plan <br />4. Site Utility Plan <br />5 Site Plan <br />6. Landscape Plan <br />7. Site Plan <br />8. Exterior Elevations <br />9. Lino Lakes Retail Lots 2 and 3 <br />10. BMP Target Site /2001 <br />11. Site Plan Lighting & Power <br />12. Light Fixtures <br />13. Cover letter HTG Architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.